How To Fix OIUBL014 - PBA to WC/MP cross reference begins before start date of PBA &/&


OIUBL014 - Overview

  • Message type: E = Error

  • Message class: OIUBL - PRA Balancing Messages

  • Message number: 014

  • Message text: PBA to WC/MP cross reference begins before start date of PBA &/&

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIUBL014 - PBA to WC/MP cross reference begins before start date of PBA &/& ?
    The SAP error message OIUBL014 indicates that there is an issue with the cross-reference between a Production Business Area (PBA) and a Work Center (WC) or Maintenance Plan (MP). Specifically, the error suggests that the cross-reference is set to begin before the defined start date of the PBA. This can occur in various scenarios, particularly in the context of production planning and maintenance management.
    
    Cause: Incorrect Date Configuration: The start date for the PBA is set later than the start date of the cross-reference to the Work Center or Maintenance Plan. Data Entry Errors: There may have been a mistake during data entry, leading to incorrect dates being assigned. System
    Configuration Issues: The configuration settings in SAP may not align properly, causing discrepancies in date management.
    Solution: Check Dates: Review the start date of the PBA and the associated cross-reference. Ensure that the cross-reference start date is not earlier than the PBA start date. Adjust Dates: If

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author