Do you have any question about this error?
Message type: E = Error
Message class: OIJ_NOM - TSW - Nominaition message class
Message number: 517
Message text: Total scheduled qty. &1 &2 exceeds tolerance limits of ref.doc.qty.&3 &4
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
OIJ_NOM517
- Total scheduled qty. &1 &2 exceeds tolerance limits of ref.doc.qty.&3 &4 ?The SAP error message OIJ_NOM517 indicates that the total scheduled quantity exceeds the tolerance limits set for the reference document quantity. This error typically occurs in the context of SAP Oil and Gas (OIJ) when dealing with operations related to scheduling and inventory management.
Cause:
- Tolerance Limits: The system has predefined tolerance limits for scheduled quantities in relation to the reference document (like a purchase order, production order, etc.). If the total scheduled quantity exceeds these limits, the error is triggered.
- Data Entry Errors: Incorrect data entry during scheduling or planning can lead to quantities that exceed the allowed limits.
- Configuration Issues: The tolerance limits may not be configured correctly in the system, leading to unexpected errors.
Solution:
- Review Scheduled Quantities: Check the total scheduled quantity against the reference document quantity. Ensure that the scheduled quantity is within the allowed tolerance limits.
- Adjust Tolerance Limits: If the business process requires higher tolerance limits, consider adjusting the configuration in the system. This can usually be done by a system administrator or someone with the appropriate authorization.
- Correct Data Entry: If the error is due to incorrect data entry, correct the quantities in the relevant documents and try the operation again.
- Consult Documentation: Review the SAP documentation or configuration guides related to tolerance limits for scheduled quantities to ensure that the settings align with business requirements.
- Contact Support: If the issue persists, consider reaching out to SAP support or your internal IT team for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
OIJ_NOM516
Total scheduled quantity &1 &2 exceeds ref. document quantity &3 &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIJ_NOM515
Reference document &1 has status completed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIJ_NOM518
Perform upstream confirmation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIJ_NOM519
Do not perform forward confirmation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.