Do you have any question about this error?
Message type: E = Error
Message class: OIJ_LDSCHED - TSW: Load/Discharge Scheduling Message Class
Message number: 230
Message text: Berths can not scheduled out of time range &1 - &2 (BS.Line &3)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
OIJ_LDSCHED230
- Berths can not scheduled out of time range &1 - &2 (BS.Line &3) ?The SAP error message OIJ_LDSCHED230 indicates that there is an issue with scheduling berths outside of the allowed time range. This error typically occurs in the context of logistics and scheduling within the SAP Oil and Gas (OIJ) module, particularly when dealing with loading and unloading operations.
Cause:
The error message is triggered when an attempt is made to schedule a berth (a designated area for loading or unloading vessels) outside of the predefined time range. The time range is usually defined in the system settings or configuration for the specific operation or resource. The parameters in the error message (
&1
,&2
, and&3
) represent:
&1
: The start time of the allowed scheduling range.&2
: The end time of the allowed scheduling range.&3
: The business line or specific identifier related to the scheduling operation.To resolve this error, you can take the following steps:
Check Time Range Configuration:
Adjust Scheduling Request:
Consult with Configuration Team:
Review Business Line Settings:
Check for Other Constraints:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
OIJ_LDSCHED229
Berths can not be scheduled for a time before &1 (BS.Line &2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIJ_LDSCHED228
Load/Disch. sched. lines for peg id &1 must be deleted before unpegging
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIJ_LDSCHED231
You did not enter a start date and/or end date when selecting time frame
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIJ_LDSCHED232
In the selected time frame, the end date you entered is before start date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.