Do you have any question about this error?
Message type: E = Error
Message class: OIJ_LDSCHED - TSW: Load/Discharge Scheduling Message Class
Message number: 009
Message text: Material &1 is not assigned to loading system &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
OIJ_LDSCHED009
- Material &1 is not assigned to loading system &2 ?The SAP error message OIJ_LDSCHED009 indicates that a specific material (denoted as &1) is not assigned to the loading system (denoted as &2) in the context of the SAP Oil and Gas (OIJ) module. This error typically arises during processes related to loading schedules, where the system expects a material to be linked to a specific loading system for operations such as scheduling, loading, or transportation.
Cause:
- Missing Assignment: The material has not been assigned to the specified loading system in the configuration settings.
- Incorrect Configuration: There may be an issue with the configuration of the loading system or the material master data.
- Data Inconsistency: There could be inconsistencies in the data that prevent the system from recognizing the relationship between the material and the loading system.
Solution:
To resolve this error, you can follow these steps:
Check Material Assignment:
- Go to the relevant transaction in SAP (e.g., OIJ or MM transactions) to check the assignment of the material to the loading system.
- Ensure that the material is correctly assigned to the loading system in the configuration.
Assign Material to Loading System:
- If the material is not assigned, you will need to assign it. This can typically be done in the configuration settings for the loading system.
- Navigate to the configuration settings for the loading system and add the material to the list of assigned materials.
Review Material Master Data:
- Check the material master data to ensure that all necessary fields are filled out correctly and that the material is set up for use in the loading system.
- Ensure that the material type and other relevant attributes are compatible with the loading system.
Consult Documentation:
- Refer to SAP documentation or help resources specific to the OIJ module for detailed steps on how to configure loading systems and materials.
Testing:
- After making the necessary changes, test the process again to ensure that the error no longer occurs.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the OIJ module for further assistance.
Get instant SAP help. Start your 7-day free trial now.
OIJ_LDSCHED008
Loading System &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIJ_LDSCHED007
Material & is not assigned to Berth &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIJ_LDSCHED010
Meter & is not assigned to location &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIJ_LDSCHED011
Lightering nomination vessel and lightering vessel entered are different
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.