Message type: E = Error
Message class: OIJ_IF - OIL TSW: Messages for TSW Interfaces Layer
Message number: 166
Message text: Route check failed for Route &1, node location &2, TSW location &3
The route check failed for the assigned route &V1&, route node location
&V2& that was derived from TSW location &V3&.
This can have various reasons according to the check type. The used
check type is '&V4&':
Check type '': The nomination assigned TSW locations are not defined on
this route.
Check type 'S': The nomination assigned TSW locations have a different
sequence according to their scheduling date compared with the node
location sequence defined for the route.
Check type 'T': The transport times between the TSW locations as
defined for the TSW nomination items, calculated from the scheduling
date and time at the TSW location, is not within the allowed tolerance
of the transportation time as defined for the corresponding route
stages.
Route stages are not assigned to the nomination assigned transport
system
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Change or enhance the route or adapt the nomination line item locations
or scheduled dates & times.
Error message extract from SAP system. Copyright SAP SE.
OIJ_IF166
- Route check failed for Route &1, node location &2, TSW location &3 ?The SAP error message OIJ_IF166, which states "Route check failed for Route &1, node location &2, TSW location &3," typically occurs in the context of the SAP Oil and Gas (OIJ) module, particularly when dealing with transportation and logistics processes. This error indicates that there is an issue with the route configuration or the relationship between the specified locations in the Transportation Scheduling Workbench (TSW). Causes: Route
Configuration Issues: The route specified in the error message may not be properly configured in the system. This could include missing or incorrect details about the route, such as the sequence of nodes or the connections between them. Location Mismatch: The node location and TSW location may not be correctly linked or may not exist in the system. This can happen if there are changes in the master data or if the locations have been deleted or modified. Inconsistent Data: There may be inconsistencies in the data
Get instant SAP help. Sign up for our Free Essentials Plan.
OIJ_IF165
Transport system MoT &1 different from Route MoT &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIJ_IF164
Deletion not possible
What causes this issue? You have tried to delete a nomination or its items that already have been scheduled and confirmed.System Response The system...
OIJ_IF167
No suitable route found for defined TSW locations and transport systems
What causes this issue? The system tried to read routes according to the following selection criteria: TSW locations and assigned route nodes TSW tra...
OIJ_IF168
Pipeline Batch handling not active for transport system &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.