How To Fix OIJ_FM009 - Planned Start Date To is greater than planned End date from at line &.


OIJ_FM009 - Overview

  • Message type: E = Error

  • Message class: OIJ_FM - Message Class for IS-Oil Fleet Management

  • Message number: 009

  • Message text: Planned Start Date To is greater than planned End date from at line &.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


OIJ_FM009 - Details

  • The SAP error message OIJ_FM009, which states "Planned Start Date To is greater than Planned End Date from at line &," typically occurs in the context of project management or production planning within the SAP system. This error indicates that there is a logical inconsistency in the date fields where the planned start date is set to a later date than the planned end date.
    
    Cause: Incorrect Date Entry: The most common cause is that the user has entered the planned start date and planned end date incorrectly, leading to the start date being after the end date. Data Migration Issues: If data has been migrated from another system or manually uploaded, there may be inconsistencies in the date formats or values. System Configuration: There may be issues with the configuration of the project or production planning module that leads to incorrect date calculations or validations.
    Solution: Check Date Entries: Review the planned start and end

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


OIJ_FM009 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author