How To Fix OIJ_FM009 - Planned Start Date To is greater than planned End date from at line &.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: OIJ_FM - Message Class for IS-Oil Fleet Management

  • Message number: 009

  • Message text: Planned Start Date To is greater than planned End date from at line &.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIJ_FM009 - Planned Start Date To is greater than planned End date from at line &. ?

    The SAP error message OIJ_FM009, which states "Planned Start Date To is greater than Planned End Date from at line &," typically occurs in the context of project management or production planning within the SAP system. This error indicates that there is a logical inconsistency in the date fields where the planned start date is set to a later date than the planned end date.

    Cause:

    1. Incorrect Date Entry: The most common cause is that the user has entered the planned start date and planned end date incorrectly, leading to the start date being after the end date.
    2. Data Migration Issues: If data has been migrated from another system or manually uploaded, there may be inconsistencies in the date formats or values.
    3. System Configuration: There may be issues with the configuration of the project or production planning module that leads to incorrect date calculations or validations.

    Solution:

    1. Check Date Entries: Review the planned start and end dates for the specific line item indicated in the error message. Ensure that the planned start date is earlier than the planned end date.
    2. Correct the Dates: If the dates are incorrect, update them to reflect the correct timeline. Make sure to save the changes.
    3. Validation: After correcting the dates, validate the entries to ensure that the error does not reoccur.
    4. Review Related Entries: If the error persists, check other related entries or dependencies that might affect the date settings.
    5. Consult Documentation: If you are unsure about the correct dates, refer to project documentation or consult with project stakeholders to confirm the intended timeline.
    6. System Configuration: If you suspect a configuration issue, consult with your SAP Basis or configuration team to ensure that the system settings are correct.

    Related Information:

    • Transaction Codes: Depending on the context, you may be using transaction codes like OIJ_FM (for Financial Management in Oil & Gas) or others related to project management.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Training: Ensure that users are trained on how to correctly enter date fields to avoid similar errors in the future.
    • Testing: If changes are made to the system configuration, conduct thorough testing to ensure that the issue is resolved and does not affect other functionalities.

    By following these steps, you should be able to resolve the OIJ_FM009 error and ensure that your planned dates are correctly set in the SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.