Do you have any question about this error?
Message type: E = Error
Message class: OIJ_DS -
Message number: 015
Message text: The SPW To Date must be greater than SPW From Date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
OIJ_DS015
- The SPW To Date must be greater than SPW From Date ?The SAP error message OIJ_DS015, which states "The SPW To Date must be greater than SPW From Date," typically occurs in the context of the SAP Oil and Gas (OIJ) module when dealing with scheduling or planning activities. This error indicates that the "To Date" specified for a scheduling period is not later than the "From Date," which is a requirement for proper date range validation.
Cause:
- Incorrect Date Entry: The most common cause of this error is that the user has entered the "To Date" as the same as or earlier than the "From Date."
- Data Entry Mistakes: Typographical errors or misinterpretation of date formats can lead to this issue.
- System Configuration: In some cases, system settings or configurations may not allow for the correct interpretation of date ranges.
Solution:
- Check Date Inputs: Review the dates entered in the relevant fields. Ensure that the "To Date" is indeed later than the "From Date."
- Correct Format: Make sure that the dates are entered in the correct format as expected by the system (e.g., DD/MM/YYYY or MM/DD/YYYY).
- Validation: Implement validation checks in the user interface to prevent users from entering invalid date ranges.
- User Training: Provide training or documentation to users to help them understand the importance of correct date entry and the implications of date ranges in scheduling.
- System Configuration: If the issue persists, consult with your SAP Basis or technical team to check if there are any configuration settings that need to be adjusted.
Related Information:
By following these steps, you should be able to resolve the OIJ_DS015 error and ensure that your scheduling activities proceed without further issues.
Get instant SAP help. Start your 7-day free trial now.
OIJ_DS014
Enter valid SPW To Date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIJ_DS013
Enter valid SPW From Date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIJ_DS016
General date range cannot be exceeded
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OIJ_DS017
Select a material if you check aggregation by material
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.