How To Fix OIJ_3WP057 - For BOM explosion at least one Supply Item has to be 'Pegging to Stock'


SAP Error Message - Details

  • Message type: E = Error

  • Message class: OIJ_3WP - Three way pegging message class, component of TSW

  • Message number: 057

  • Message text: For BOM explosion at least one Supply Item has to be 'Pegging to Stock'

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OIJ_3WP057 - For BOM explosion at least one Supply Item has to be 'Pegging to Stock' ?

    The SAP error message OIJ_3WP057 indicates that during a Bill of Materials (BOM) explosion, at least one supply item must be set to "Pegging to Stock." This error typically occurs in the context of production planning or materials management when the system is unable to find a suitable supply item to fulfill the demand for a component in the BOM.

    Cause:

    1. Supply Item Configuration: The supply items (materials) in the BOM may not be configured correctly. Specifically, they may not be set to allow pegging to stock.
    2. Stock Availability: There may be no available stock for the items that are required to fulfill the BOM explosion.
    3. Planning Parameters: The planning parameters for the materials may not be set correctly, leading to issues in how the system interprets the supply items.
    4. BOM Structure: The BOM structure may not be correctly defined, leading to issues in how the components are linked to the supply items.

    Solution:

    1. Check Supply Item Settings:

      • Go to the material master of the supply items and ensure that the "Pegging to Stock" option is enabled. This is usually found in the MRP (Material Requirements Planning) views.
    2. Review BOM Configuration:

      • Ensure that the BOM is correctly configured and that all components are linked to the appropriate supply items.
      • Check if the components in the BOM are correctly defined and that they have valid supply items associated with them.
    3. Stock Availability Check:

      • Verify that there is sufficient stock available for the supply items. If stock is not available, consider creating stock or adjusting the planning parameters to ensure that the system can find the necessary supply.
    4. Adjust Planning Parameters:

      • Review the planning parameters for the materials involved. Ensure that they are set to allow for proper pegging and that the planning strategy is appropriate for the type of materials being used.
    5. Run MRP:

      • After making the necessary adjustments, run the MRP process again to see if the error persists.
    6. Consult Documentation:

      • Refer to SAP documentation or help resources for specific details on how to configure supply items and BOMs correctly.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CS01 (Create BOM), CS02 (Change BOM), CS03 (Display BOM), and MD01 (MRP Run) to manage BOMs and materials.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance on BOM configuration and supply item settings.
    • User Roles: Ensure that you have the necessary authorizations to make changes to BOMs and material master data.

    By following these steps, you should be able to resolve the OIJ_3WP057 error and successfully perform the BOM explosion.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker