How To Fix OD896 - Plan horizon greater than difference of rolling period and days in past.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: OD - IS-Oil: TSW Traders' and Schedulers' Workbench messages

  • Message number: 896

  • Message text: Plan horizon greater than difference of rolling period and days in past.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OD896 - Plan horizon greater than difference of rolling period and days in past. ?

    The SAP error message OD896, which states "Plan horizon greater than difference of rolling period and days in past," typically occurs in the context of planning and forecasting within SAP systems, particularly in modules like SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO).

    Cause:

    This error arises when the planning horizon you have set exceeds the allowable range defined by the rolling period and the number of days in the past. In simpler terms, it means that the system is trying to plan for a period that is not valid based on the configuration of your planning parameters.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Planning Horizon Settings:

      • Navigate to the planning settings in your SAP system.
      • Verify the configuration of the planning horizon. Ensure that it is set correctly and does not exceed the difference between the rolling period and the days in the past.
    2. Adjust Rolling Period:

      • If necessary, consider adjusting the rolling period to accommodate the planning horizon you wish to set. This may involve changing the configuration in the planning area or the relevant settings in the planning book.
    3. Modify Days in Past:

      • Review the "days in past" setting. If it is set too low, you may need to increase it to allow for a longer planning horizon.
    4. Consult Documentation:

      • Refer to the SAP documentation or help files related to your specific module (IBP, APO, etc.) for detailed guidance on configuring planning horizons and rolling periods.
    5. Test Changes:

      • After making adjustments, test the changes by attempting to execute the planning function again to ensure that the error is resolved.
    6. Seek Help from SAP Support:

      • If the issue persists after making the necessary adjustments, consider reaching out to SAP support or consulting with an SAP expert who can provide more tailored assistance based on your specific configuration and requirements.

    Related Information:

    • Planning Horizon: This is the time frame for which you want to create plans. It is essential to set this correctly to ensure that your planning processes run smoothly.
    • Rolling Period: This refers to the time frame that is continuously updated based on the current date, affecting how far into the future you can plan.
    • Days in Past: This setting allows you to define how many days back in time you can consider for planning purposes.

    By understanding these components and adjusting your settings accordingly, you should be able to resolve the OD896 error and continue with your planning activities in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker