How To Fix OD526 - The absolute "under tolerance" is greater than the scheduled quantity.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: OD - IS-Oil: TSW Traders' and Schedulers' Workbench messages

  • Message number: 526

  • Message text: The absolute "under tolerance" is greater than the scheduled quantity.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OD526 - The absolute "under tolerance" is greater than the scheduled quantity. ?

    The SAP error message OD526, which states "The absolute 'under tolerance' is greater than the scheduled quantity," typically occurs in the context of production planning or order processing. This error indicates that the system has detected a discrepancy between the expected quantity of a product and the actual quantity that is being processed or produced, specifically in relation to the defined tolerances.

    Cause:

    1. Tolerance Settings: The error is often caused by the tolerance settings defined in the system. If the "under tolerance" value (the acceptable deviation below the scheduled quantity) is set too high compared to the scheduled quantity, the system will trigger this error.
    2. Production Order Issues: If a production order is expected to produce a certain quantity but the actual production is significantly lower than that quantity, this error can occur.
    3. Data Entry Errors: Incorrect data entry during the creation of production orders or during the confirmation of production can lead to this error.
    4. Configuration Issues: There may be issues with the configuration of the material master or production planning settings that lead to incorrect tolerance calculations.

    Solution:

    1. Review Tolerance Settings: Check the tolerance settings in the material master or production order settings. Adjust the "under tolerance" value to ensure it is appropriate for the scheduled quantity.
    2. Check Production Orders: Review the production orders to ensure that the scheduled quantities are realistic and that the actual production quantities are being confirmed correctly.
    3. Data Validation: Ensure that all data entries related to production orders are accurate. This includes checking for any discrepancies in the quantities entered during production confirmations.
    4. Consult Configuration: If the issue persists, consult with your SAP configuration team to review the settings related to production planning and tolerances. They may need to adjust the configuration to align with business requirements.
    5. Error Handling: If the error is due to a temporary issue, you may need to reprocess the order or confirm the production again after making the necessary adjustments.

    Related Information:

    • SAP Documentation: Refer to SAP Help documentation for detailed information on production planning and tolerance settings.
    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CO11N (for production order confirmation) and COHV (for mass processing of production orders).
    • User Exits and BAdIs: If custom logic is implemented, check for any user exits or Business Add-Ins (BAdIs) that may affect how tolerances are calculated or validated.
    • Support Forums: Consider checking SAP community forums or support channels for similar issues and solutions shared by other users.

    By addressing the underlying causes and following the suggested solutions, you should be able to resolve the OD526 error in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker