How To Fix OD334 - Cannot change material assignment, it is used in Stock Projection.


OD334 - Overview

  • Message type: E = Error

  • Message class: OD - IS-Oil: TSW Traders' and Schedulers' Workbench messages

  • Message number: 334

  • Message text: Cannot change material assignment, it is used in Stock Projection.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message OD334 - Cannot change material assignment, it is used in Stock Projection. ?
    The SAP error message OD334, which states "Cannot change material assignment, it is used in Stock Projection," typically occurs when you attempt to modify the material assignment in a way that is not allowed because the material is currently being referenced in stock projection calculations or reports. This can happen in various contexts, such as during inventory management or when dealing with material master data.
    
    Cause: Active Stock Projections: The material is currently involved in stock projection calculations, which means that the system is using it to forecast stock levels, availability, or other related metrics. Locked Data: The material assignment may be locked due to ongoing processes or transactions that are dependent on the current assignment. Dependencies: There may be dependencies or links to other documents or processes that prevent changes to the material assignment.
    Solution: To resolve this error, you can take the following steps: Check Stock Projections: Review the stock projection reports or calculations to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant