Message type: E = Error
Message class: OAF_SCHED - Agent Framework: Scheduling of Agents
Message number: 024
Message text: Report variant &1 was created for schedulung group &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
OAF_SCHED024
- Report variant &1 was created for schedulung group &2 ?The SAP error message OAF_SCHED024 indicates that a report variant has been created for a scheduling group, but there may be issues related to the configuration or execution of that variant. Here’s a breakdown of the cause, potential solutions, and related information:
Cause: Report Variant Issues: The report variant specified in the error message may not be correctly configured or may not exist. Scheduling Group Problems: The scheduling group referenced may not be properly set up or may not have the necessary authorizations. Authorization Issues: The user executing the report may not have the required permissions to access the report variant or the scheduling group. Technical Errors: There could be underlying technical issues, such as database connectivity problems or system configuration errors.
Solution: Check Report Variant: Go to the transaction code for the report (e.g., SE38 or SA38) and check if the report variant exists. Ensure that the variant is correctly configured with the necessary parameters. Verify Scheduling Group: Check the
Get instant SAP help. Sign up for our Free Essentials Plan.
OAF_SCHED023
Scheduling group &1 has been scheduled for processing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
OAF_SCHED022
Scheduling of scheduling group &1 failed
What causes this issue? You have tried to schedule the execution of an agent in a scheduling group. This was unsuccessful.System Response The system...
OAF_SCHED025
Error in scheduling group &1
What causes this issue? The entries for this scheduling group are incomplete or incorrect.System Response The system cannot process the scheduling g...
OAF_SCHED026
&1 report variant(s) created
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.