Do you have any question about this error?
Message type: E = Error
Message class: MZ - Message for the EWS in LIS
Message number: 088
Message text: Proposal from exception: & to &
A period of time with &V1& period(s) was chosen for the standard
analysis. A quantity of &V2& was saved in the
exception definition for the time period.
This causes incorrect readings if data from the exception is based on
the number of periods that were noted there.
For example, an analysis with a threshold value of 40,000 DM and a
quantity of &V1& for the period will have completely different results
than with a quantity of &V2&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MZ088
- Proposal from exception: & to & ?The SAP error message MZ088, which states "Proposal from exception: & to &", typically occurs in the context of material requirements planning (MRP) or when dealing with procurement proposals in SAP. This error indicates that there is an issue with the proposal generation process, often related to exceptions in the planning run.
Causes:
- Planning Parameters: Incorrect or missing planning parameters in the material master or MRP settings can lead to exceptions during the proposal generation.
- Stock Levels: Insufficient stock levels or incorrect stock status can trigger exceptions.
- Demand and Supply Mismatch: If there is a mismatch between demand (sales orders, forecasts) and supply (available stock, production orders), it can lead to exceptions.
- MRP Type: The MRP type assigned to the material may not be appropriate for the planning scenario.
- Lot Size Issues: If the lot size settings are not configured correctly, it can lead to exceptions in the proposal.
- Exception Messages: The system may generate exception messages during the MRP run that need to be addressed.
Solutions:
- Check MRP Parameters: Review the MRP parameters in the material master (transaction MM02) to ensure they are set correctly.
- Analyze Stock Levels: Check the stock levels and ensure that they are sufficient to meet the demand. Use transaction code MD04 to view stock/requirements lists.
- Review Demand and Supply: Analyze the demand and supply situation for the material. Ensure that all sales orders and forecasts are correctly entered.
- Adjust MRP Type: If the MRP type is not suitable, consider changing it to a more appropriate type based on your planning strategy.
- Lot Size Configuration: Review and adjust the lot size settings in the material master to ensure they align with your procurement strategy.
- Address Exception Messages: Review any exception messages generated during the MRP run (transaction MD03) and take corrective actions as needed.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or refer to SAP Notes for specific guidance related to the error message.
Get instant SAP help. Start your 7-day free trial now.
MZ087
Not possible to delete (periodic analysis)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MZ086
No event-driven analysis possible for info structure &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MZ089
The name of an exception cannot begin with ~
What causes this issue? The name of an exception cannot begin with ~System Response Please choose a name that does not begin with ~.How to fix this ...
MZ090
Exception & blocked by other users
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.