Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: /MVA/AMC_BM_MSG -
Message number: 817
Message text: Invalid start date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/MVA/AMC_BM_MSG817
- Invalid start date ?The SAP error message
/MVA/AMC_BM_MSG817 Invalid start date
typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when dealing with planning or scheduling activities. This error indicates that the start date provided in a transaction or planning run is not valid, which can be due to several reasons.Causes:
- Incorrect Date Format: The date may not be in the expected format (e.g., DD/MM/YYYY vs. MM/DD/YYYY).
- Date Out of Range: The start date may fall outside the permissible range defined in the system settings or planning horizon.
- Closed Periods: The date may fall within a closed period where no planning activities are allowed.
- Missing Master Data: Related master data (like product or location) may not be set up correctly for the specified date.
- System Configuration: Configuration settings in the planning area or planning book may restrict the use of certain dates.
Solutions:
- Check Date Format: Ensure that the date is entered in the correct format as expected by the system.
- Validate Date Range: Verify that the start date is within the allowed planning horizon and not in a closed period.
- Review Master Data: Ensure that all relevant master data is correctly set up and active for the specified date.
- Adjust Planning Parameters: If necessary, adjust the planning parameters or configuration settings to allow for the desired date.
- Consult Documentation: Refer to SAP documentation or help files for specific details on date handling in your version of SAP.
Related Information:
/MVA/AMC_BM
or others related to planning.By addressing the above points, you should be able to resolve the /MVA/AMC_BM_MSG817 Invalid start date
error in SAP.
Get instant SAP help. Sign up for our Free Essentials Plan.
/MVA/AMC_BM_MSG816
Bonus-malus &1 is being used from &2 to &3 in contract &4
What causes this issue? The bonus-malus is being used for a specific period by a different contract. Any changes made can therefore affect other cont...
/MVA/AMC_BM_MSG815
Start date must be before or same as date of B/M contract assignment (&1)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/MVA/AMC_BM_MSG818
Rating reason is only allowed for comprehensive coverage
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/MVA/AMC_BM_MSG819
Existing bonus-malus is required for liability coverage
What causes this issue? A liability coverage must exist in the same contract for rating reason "Alignment of full coverage with vehicle liabilit...
Click on this link to search all SAP messages.