How To Fix /MVA/ABP_PP043 - Selection: TMF between &1/&2 and &3/&4 (change type/fine control).


/MVA/ABP_PP043 - Overview

  • Message type: E = Error

  • Message class: /MVA/ABP_PP -

  • Message number: 043

  • Message text: Selection: TMF between &1/&2 and &3/&4 (change type/fine control).

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/MVA/ABP_PP043 - Details

  • The SAP error message /MVA/ABP_PP043 typically relates to issues with the selection of a time frame for a change type or fine control in the context of Advanced Planning (APO) or similar modules. This error can occur when there is a mismatch or inconsistency in the time frames specified for the planning process.
    
    Cause: Incorrect Time Frame: The error indicates that the time frame specified (from &1/&2 to &3/&4) is not valid for the selected change type or fine control settings.
    Configuration Issues: There may be configuration issues in the planning settings or master data that do not align with the specified time frame. Data Inconsistencies: There could be inconsistencies in the data that prevent the system from processing the request correctly.
    Solution: Check Time Frame: Verify the time frame specified in the selection criteria. Ensure that the start and end dates are correct and that they align with the planning horizon defined in the system. Review

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/MVA/ABP_PP043 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker