Do you have any question about this error?
Message type: E = Error
Message class: MU - Maintenance of structured materials
Message number: 062
Message text: The material &1 is used in purchasing documents; only display possible
You want to create or change a bill of material (BOM) for the
<DS:GLOS.3526BBD7AFAB52B9E10000009B38F974>structured material</> &V1&.
However, this material is already used in purchasing documents (such as
purchase orders). To prevent data inconsistencies, the BOM may no
longer be changed.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
INCLUDE BOM OBJECT DOKU ID TX LANGUAGE EN
Error message extract from SAP system. Copyright SAP SE.
MU062
- The material &1 is used in purchasing documents; only display possible ?The SAP error message MU062 indicates that a material is currently being used in purchasing documents, which means that it cannot be changed or deleted in the material master. This is a protective measure to prevent inconsistencies in the system, as changes to materials that are referenced in purchasing documents could lead to data integrity issues.
Cause:
The error occurs when you attempt to make changes to a material that is linked to existing purchasing documents, such as purchase orders, contracts, or requisitions. The system restricts modifications to ensure that the integrity of these documents is maintained.
Solution:
To resolve this issue, you can take the following steps:
Display Mode: If you only need to view the material details, you can proceed in display mode. This will allow you to see the information without making any changes.
Check Purchasing Documents: If you need to make changes to the material, first check which purchasing documents are referencing the material. You can do this by:
- Using transaction codes like ME23N (Display Purchase Order) or ME3N (Display Outline Agreement) to find the relevant documents.
- Reviewing the purchasing info records associated with the material.
Remove References: If you need to make changes to the material, you will have to remove or close the purchasing documents that reference it. This may involve:
- Deleting or changing purchase orders (if permissible).
- Closing contracts or agreements that are still active.
Consult with Stakeholders: Before making any changes, consult with relevant stakeholders (e.g., purchasing department) to ensure that removing or modifying the purchasing documents will not disrupt business operations.
Use Transaction Codes: If you have the necessary authorizations, you can use transaction codes like ME22N (Change Purchase Order) to modify or delete the purchasing documents.
Material Master Changes: Once all references are cleared, you can proceed to make the necessary changes to the material master using transaction MM02 (Change Material).
Related Information:
If you continue to face issues or if the purchasing documents cannot be modified, it may be necessary to consult with your SAP support team or a functional consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
MU061
You have already maintained a BOM in this transaction
What causes this issue? You want to create or change a bill of material (BOM) for the material &V2&. However, you have already created or cha...
MU060
Specify a material
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MU063
The material &1 is already listed; only display possible
What causes this issue? You want to create or change a bill of material (BOM) for the <DS:GLOS.3526BBD7AFAB52B9E10000009B38F974>structured mate...
MU064
A system error has occurred in management of the hierarchy display
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
Click on this link to search all SAP messages.