Do you have any question about this error?
Message type: E = Error
Message class: MSPCIF -
Message number: 041
Message text: Call object &1/&2 has been skipped, but is linked to demand &3
The planner skipped call object &V2& in the schedule of maintenance plan
&V1&.
Since the planner intentionally skipped the call object, the incoming
SAP SCM demand &V3& is linked to the call object.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MSPCIF041
- Call object &1/&2 has been skipped, but is linked to demand &3 ?The SAP error message MSPCIF041 indicates that a call object (such as a production order or a planned order) has been skipped during the processing of a demand (like a sales order or a forecast). This typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when dealing with the integration of demand and supply planning.
Cause:
The error can arise due to several reasons, including:
- Inconsistent Data: The call object may not have the necessary data or may be in an inconsistent state, preventing it from being processed.
- Planning Parameters: The planning parameters set for the call object may not align with the demand, leading to a situation where the system decides to skip it.
- Resource Constraints: If there are resource constraints or capacity issues, the system may skip the call object to optimize planning.
- Linkage Issues: There may be issues with how the call object is linked to the demand, such as missing or incorrect assignment.
Solution:
To resolve the MSPCIF041 error, consider the following steps:
- Check Data Consistency: Verify that the call object and the demand are correctly defined and that all necessary data is available. Ensure that the call object is not in a locked or inconsistent state.
- Review Planning Parameters: Examine the planning parameters for the call object and ensure they are set correctly. Adjust them if necessary to align with the demand.
- Analyze Resource Availability: Check the availability of resources and capacity. If there are constraints, consider adjusting the planning or resource allocation.
- Examine Linkages: Investigate the linkage between the call object and the demand. Ensure that they are correctly linked and that there are no discrepancies.
- Run Planning Again: After making the necessary adjustments, rerun the planning process to see if the issue persists.
Related Information:
/SAPAPO/MC90
(for demand planning) or /SAPAPO/MC94
(for supply planning) to analyze the planning data.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
MSPCIF040
Schedule of maint. plan &1 restarted at call obj. &2 (Context: &3/&4)
What causes this issue? The scheduling of maintenance plan &V1& has been restarted at call object &V2&. The restarting point &V2&...
MSPCIF039
Maintenance plan &1 cannot be locked (being used by &2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MSPCIF042
Incoming data is inconsistent for slot &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MSPCIF043
Maintenance object &1/&2 is invalid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.