Do you have any question about this error?
Message type: E = Error
Message class: MS - SAP customer enhancement project messages
Message number: 043
Message text: Proposal &1 was canceled for &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MS043
- Proposal &1 was canceled for &2 ?The SAP error message MS043, which states "Proposal &1 was canceled for &2," typically occurs in the context of the Material Requirements Planning (MRP) process. This message indicates that a specific proposal (such as a planned order or purchase requisition) has been canceled for a particular material or item.
Causes:
- Manual Cancellation: The proposal may have been manually canceled by a user.
- Planning Parameters: Changes in planning parameters or settings may lead to the cancellation of proposals.
- Stock Availability: If stock levels change (e.g., due to a goods receipt or inventory adjustment), the system may determine that the proposal is no longer necessary.
- Changes in Demand: If the demand for the material changes (e.g., due to changes in sales orders or forecasts), the system may cancel the proposal.
- MRP Run Issues: Errors or issues during the MRP run can lead to proposals being canceled.
Solutions:
- Check Proposal Status: Review the status of the proposal in the system to understand why it was canceled. You can do this by navigating to the relevant transaction (e.g., MD04 for stock/requirements list).
- Review MRP Parameters: Ensure that the MRP parameters for the material are correctly set. This includes checking the lot size, safety stock, and reorder point settings.
- Analyze Demand Changes: Investigate any changes in demand that may have led to the cancellation. This could involve checking sales orders, forecasts, or other demand-related documents.
- Re-run MRP: If necessary, re-run the MRP process to generate new proposals based on the current data.
- Consult Logs: Check the MRP logs for any errors or warnings that may provide additional context for the cancellation.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or refer to SAP Notes for any known issues related to this error message.
Get instant SAP help. Start your 7-day free trial now.
MS042
Proposal &1 was set for &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MS041
No user assigned to variant group &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MS044
&1 was assigned to variant group &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MS045
Assignment of &1 to variant group &2 was canceled
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.