Message type: E = Error
Message class: MPN02 - MPN Message: Materials Planning
Message number: 016
Message text: &1 cannot be planned in plant &2 (MRP type &3)
Availability indicator &V3& has been entered for material &V1& for
plant &V2&. This availability indicator has MRP procedure 'N' - not
planned for material requirements. Material requirements planning must
however be possible for
<DS:GLOS.3608C3DABA271348E10000009B38F91F>MPN-MRP sets</>.
Input a different availability indicator or remove the material from
the MPN-MRP set.
Error message extract from SAP system. Copyright SAP SE.
MPN02016
- &1 cannot be planned in plant &2 (MRP type &3) ?The SAP error message MPN02016 indicates that a material cannot be planned in a specific plant due to its MRP (Material Requirements Planning) type. This error typically arises in the context of MRP runs or when trying to create or modify planning data for a material.
Cause:
The error message MPN02016 is triggered when:
- The material is not set up for planning in the specified plant.
- The MRP type assigned to the material does not allow for planning in that plant.
- The material may be marked as "not relevant for planning" or has been set to a status that prevents it from being included in MRP calculations.
- The plant itself may not be set up correctly for MRP processes.
Solution:
To resolve the error, you can take the following steps:
Check Material Master Data:
- Go to the material master record (transaction code MM03) and check the MRP views for the material in the specified plant.
- Ensure that the MRP type is appropriate for the planning strategy you want to use.
Review MRP Type:
- Verify the MRP type assigned to the material. Common MRP types include PD (MRP), VB (Manual Reorder Point), and others. Ensure that the MRP type allows for planning.
- If necessary, change the MRP type to one that supports planning.
Check Plant Settings:
- Ensure that the plant is correctly configured for MRP. This includes checking the plant settings in the configuration (transaction code SPRO) to ensure MRP is activated.
Check Planning Parameters:
- Review the planning parameters for the material, such as lot size, safety stock, and reorder point, to ensure they are set correctly.
Check for Special Stock Indicators:
- If the material is marked as special stock (e.g., consignment, project stock), ensure that the planning settings are appropriate for that stock type.
Consult Documentation:
- Refer to SAP documentation or help resources for specific details on the MRP type and its implications for planning.
Test MRP Run:
- After making the necessary changes, perform a test MRP run to see if the error persists.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement the necessary changes to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
MPN02015
Different &1 in &2 and &3 in plant &4
What causes this issue? The materials &V2& und &V3& both contain different values in field &V1& in plant &V4&.System ...
MPN02014
&1 has special procurement type &3 in plant &2
What causes this issue? The special procurement key &V3& means subcontracting. MPN materials from an <DS:GLOS.3608C3DABA271348E10000009B38...
MPN02017
Plant &3, storage location &4: different MRP indicator in &1, &2
What causes this issue? The material requirements indicators for materials &V1& and &V2& are different for plant &V3&, storag...
MPN02018
&1 does not have an MRP type in plant &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...