Do you have any question about this error?
Message type: E = Error
Message class: MPN02 - MPN Message: Materials Planning
Message number: 001
Message text: Part & is not a leading part, planning is not allowed
Material requirements planning for inventory-managed manufacturer
parts, which are organized in
<DS:GLOS.3608C3DABA271348E10000009B38F91F>MPN-MRP sets</>, only takes
place on the <DS:GLOS.360B297326F41628E10000009B38F984>leading material
</> of the set. Therefore, the requirements planning run for an MPN-MRP
set is only triggered by the leading material. Material &V1& in
plant/MRP area &V2&/&V4& is part of an MPN-MRP set, for which Material
&V3& is the leading part.
Processing is terminated.
Carry out requirements planning for material &V3& in the same plant/MRP
area.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MPN02001
- Part & is not a leading part, planning is not allowed ?The SAP error message MPN02001, which states "Part & is not a leading part, planning is not allowed," typically occurs in the context of Material Requirements Planning (MRP) when dealing with multi-level BOMs (Bill of Materials) and planning scenarios involving variant configuration or similar setups.
Cause:
- Non-Leading Part: The part in question is not designated as a leading part in the context of the planning scenario. In SAP, a leading part is usually the main component that drives the planning process, while non-leading parts are secondary components that do not initiate planning.
- Configuration Issues: The material may not be properly configured in the system, or it may not be set up to be planned in the way you are attempting.
- BOM Structure: The BOM structure may not be correctly defined, leading to the system not recognizing the part as a valid component for planning.
- Planning Strategy: The planning strategy assigned to the material may not allow for planning of non-leading parts.
Solution:
- Check Material Master: Verify the material master data for the part in question. Ensure that it is set up correctly and that it is marked as a leading part if that is appropriate for your planning scenario.
- Review BOM Configuration: Check the BOM configuration to ensure that the part is included correctly and that the structure is valid. Make sure that the leading part is correctly defined in the BOM.
- Adjust Planning Strategy: If the planning strategy does not allow for the planning of non-leading parts, consider changing the strategy or adjusting the configuration to allow for the necessary planning.
- Consult Documentation: Review SAP documentation or consult with your SAP support team to understand the specific requirements for your planning scenario and how to configure the materials accordingly.
- Use Transaction Codes: Utilize relevant transaction codes such as CS03 (Display BOM) or MM03 (Display Material) to check the details of the material and BOM.
Related Information:
If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or a consultant who specializes in SAP MRP and BOM configurations.
Get instant SAP help. Start your 7-day free trial now.
MPN01062
Enter Valid Value
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPN01061
Specify a valid delimiter
What causes this issue? You have specified one of the following blocked special characters as the delimiter: * (asterisk) & (ampersand) , (Comm...
MPN02002
Part & has different procurement type to external procurement
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPN02003
This is not a FFF class for inventory-managed manufacturer parts
What causes this issue? This <DS:GLOS.3607AFB8AECD4ABAE10000009B38F9B8>FFF class</> is assigned to <DS:GLOS.3607AFC6AECD4ABAE10000009B...
Click on this link to search all SAP messages.