How To Fix MPN02001 - Part & is not a leading part, planning is not allowed


MPN02001 - Overview

  • Message type: E = Error

  • Message class: MPN02 - MPN Message: Materials Planning

  • Message number: 001

  • Message text: Part & is not a leading part, planning is not allowed

  • Show details Hide details
  • What causes this issue?

    Material requirements planning for inventory-managed manufacturer
    parts, which are organized in
    <DS:GLOS.3608C3DABA271348E10000009B38F91F>MPN-MRP sets</>, only takes
    place on the <DS:GLOS.360B297326F41628E10000009B38F984>leading material
    </> of the set. Therefore, the requirements planning run for an MPN-MRP
    set is only triggered by the leading material. Material &V1& in
    plant/MRP area &V2&/&V4& is part of an MPN-MRP set, for which Material
    &V3& is the leading part.

    System Response

    Processing is terminated.

    How to fix this error?

    Carry out requirements planning for material &V3& in the same plant/MRP
    area.

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPN02001 - Part & is not a leading part, planning is not allowed ?
    The SAP error message MPN02001, which states "Part & is not a leading part, planning is not allowed," typically occurs in the context of Material Requirements Planning (MRP) when dealing with multi-level BOMs (Bill of Materials) and planning scenarios involving variant configuration or similar setups.
    
    Cause: Non-Leading Part: The part in question is not designated as a leading part in the context of the planning scenario. In SAP, a leading part is usually the main component that drives the planning process, while non-leading parts are secondary components that do not initiate planning.
    Configuration Issues: The material may not be properly configured in the system, or it may not be set up to be planned in the way you are attempting. BOM Structure: The BOM structure may not be correctly defined, leading to the system not recognizing the part as a valid component for planning. Planning Strategy: The planning strategy assigned to the material may not

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant