Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: MPE_SFMASTERISSU_MSG -
Message number: 012
Message text: Shop floor routing is invalid for parameter effectivity of planned order
The material is unitized and shop floor routing is invalid for the
parameter effectivity of the planned order.
The system will not allow you to create production orders with this
production version.
Generate a new shop floor routing version which is valid for the
parameter effectivity of the planned order and release the new routing
version.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MPE_SFMASTERISSU_MSG012
- Shop floor routing is invalid for parameter effectivity of planned order ?The SAP error message MPE_SFMASTERISSU_MSG012 indicates that there is an issue with the shop floor routing for a planned order, specifically related to the effectivity parameters. This error typically arises when the routing defined for a material does not match the effectivity dates or conditions specified in the planned order.
Cause:
- Invalid Routing: The routing for the material may not be valid for the effectivity period specified in the planned order. This can happen if the routing has been changed or if the planned order is set for a time period that does not align with the routing's valid dates.
- Missing or Incorrect Effectivity Dates: The planned order may have effectivity dates that do not correspond to any valid routing in the system.
- Routing Status: The routing might be inactive or not released for use in production.
- Material Master Data Issues: There could be inconsistencies in the material master data that affect the routing.
Solution:
- Check Routing Validity: Verify the routing for the material in question. Ensure that the routing is valid for the effectivity dates of the planned order. You can do this by navigating to the routing in the SAP system and checking the validity dates.
- Adjust Planned Order Dates: If the planned order's effectivity dates are incorrect, consider adjusting them to match the valid routing dates.
- Review Material Master Data: Check the material master data for any discrepancies that might affect the routing. Ensure that the material is correctly set up with the appropriate routing.
- Activate or Release Routing: If the routing is inactive, you may need to activate or release it for use in production.
- Consult Documentation: Review any relevant documentation or guidelines for setting up routings and planned orders in your organization to ensure compliance with best practices.
Related Information:
CA03
(Display Routing) to check the routing details and MD04
(Stock/Requirements List) to view the planned order.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_SFMASTERISSU_MSG011
In-process shop floor routing version exists
What causes this issue? An in-process shop floor routing version exists for the routing referenced by the production versionSystem Response The in-p...
MPE_SFMASTERISSU_MSG010
In-process shop floor BOM version exists
What causes this issue? An in-process BOM version exists for the shop floor BOM referenced by the production versionSystem Response The in-process B...
MPE_STA_MES000
&1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_STA_MES001
Cannot be deleted as the data does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.