How To Fix MPE_RTG_UI134 - BOM item &1 is not yet completely assigned to operation activities


MPE_RTG_UI134 - Overview

  • Message type: E = Error

  • Message class: MPE_RTG_UI - Messages for Routing Maintenance

  • Message number: 134

  • Message text: BOM item &1 is not yet completely assigned to operation activities

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_RTG_UI134 - BOM item &1 is not yet completely assigned to operation activities ?
    The SAP error message MPE_RTG_UI134 indicates that a Bill of Materials (BOM) item is not completely assigned to operation activities in a production order or a related process. This error typically arises in the context of production planning and execution, where the system expects that all components of a BOM are fully assigned to the respective operations in the routing.
    
    Cause: Incomplete Assignment: The BOM item has not been fully assigned to the operation activities in the routing. This could happen if: Some components of the BOM are missing from the operation. The assignment was not saved properly. There are discrepancies between the BOM and the routing. Routing Issues: The routing may not have been updated to reflect changes in the BOM, leading to mismatches. Configuration Errors: There may be configuration issues in the production order or the way BOMs and routings are set up in the system.
    Solution: Check BOM Assignment: Go to the production order and check the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker