Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: MPE_PLAN_RTG_VERS - Manage Production Routing Version
Message number: 060
Message text: Rework routings can have only one operation
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_RTG_VERS060
- Rework routings can have only one operation ?The SAP error message MPE_PLAN_RTG_VERS060 indicates that there is an issue with the configuration of a rework routing in the system. Specifically, this error occurs when a rework routing is defined with more than one operation, which is not allowed in SAP.
Cause:
The primary cause of this error is that rework routings in SAP are designed to handle a single operation. If you attempt to create or modify a rework routing that includes multiple operations, the system will trigger this error message.
Solution:
To resolve this error, you need to ensure that the rework routing you are trying to create or modify contains only one operation. Here are the steps you can take:
Review the Routing: Check the routing you are working with to confirm the number of operations defined. You can do this by navigating to the routing in the SAP system.
Modify the Routing: If you find that there are multiple operations defined, you will need to either:
- Remove the additional operations so that only one remains.
- Create separate rework routings for each operation if multiple operations are necessary.
Save Changes: After making the necessary adjustments, save the routing and try to execute the process again.
Testing: After making the changes, test the routing to ensure that it works as expected without triggering the error.
Related Information:
If you continue to experience issues after following these steps, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_PLAN_RTG_VERS059
Method &2 of BAdI &1 is not implemented
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_RTG_VERS058
Operation &1: only rework control key can be used in rework routing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_RTG_VERS061
BOM user profile of user &1 could not be read
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_RTG_VERS062
Determination of maximum item number fails
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.