How To Fix MPE_PLAN_RTG_VERS057 - Operations can have no splitting or overlapping in rework routings


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MPE_PLAN_RTG_VERS - Manage Production Routing Version

  • Message number: 057

  • Message text: Operations can have no splitting or overlapping in rework routings

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_PLAN_RTG_VERS057 - Operations can have no splitting or overlapping in rework routings ?

    The SAP error message MPE_PLAN_RTG_VERS057 indicates that there is an issue with the routing in a production order or a planned order, specifically related to rework routings. This error occurs when the system detects that operations within a routing are either overlapping or splitting, which is not allowed in the context of rework routings.

    Cause:

    1. Overlapping Operations: This occurs when two or more operations are scheduled to occur at the same time on the same resource. For example, if Operation A is scheduled from 10:00 to 12:00 and Operation B is also scheduled from 11:00 to 13:00 on the same machine, this will trigger the error.

    2. Splitting Operations: This happens when an operation is divided into multiple segments that are not continuous. For instance, if an operation is defined to run from 10:00 to 12:00 and then again from 14:00 to 16:00, this would also cause the error.

    3. Incorrect Routing Configuration: The routing may not be set up correctly, leading to conflicts in operation scheduling.

    Solution:

    1. Review Operations: Check the operations defined in the routing for the production order or planned order. Ensure that there are no overlapping times for operations on the same resource.

    2. Adjust Scheduling: If you find overlapping operations, adjust the scheduling of the operations so that they do not conflict. This may involve changing the start and end times of operations or reassigning operations to different resources.

    3. Check Routing Configuration: Ensure that the routing is correctly configured. If necessary, modify the routing to ensure that operations are continuous and do not split.

    4. Use Alternative Resources: If overlapping is unavoidable due to resource constraints, consider using alternative resources or machines to separate the operations.

    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on configuring rework routings and handling operations.

    Related Information:

    • Routing in SAP: Understand how routings are structured in SAP, including the definition of operations, sequences, and resources.
    • Production Planning (PP) Module: Familiarize yourself with the Production Planning module in SAP, as it deals with the scheduling and management of production processes.
    • Error Handling: Learn about common error messages in SAP and how to troubleshoot them effectively.

    By addressing the causes of the error and implementing the suggested solutions, you should be able to resolve the MPE_PLAN_RTG_VERS057 error and proceed with your production planning activities.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant