How To Fix MPE_PLAN_PV082 - Task list type &1 cannot be used for BOMs with plg and execution usage


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MPE_PLAN_PV - Production Version

  • Message number: 082

  • Message text: Task list type &1 cannot be used for BOMs with plg and execution usage

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_PLAN_PV082 - Task list type &1 cannot be used for BOMs with plg and execution usage ?

    The SAP error message MPE_PLAN_PV082 indicates that a specific task list type cannot be used for Bills of Materials (BOMs) that have planning and execution usage. This error typically arises in the context of production planning and control, particularly when trying to assign or use a task list that is not compatible with the BOM's configuration.

    Cause:

    The error is caused by the following factors:

    1. Task List Type Incompatibility: The task list type you are trying to use is not designed for BOMs that have both planning and execution usage. Each task list type in SAP has specific usage scenarios, and if the task list type does not support the required usage, this error will occur.
    2. BOM Configuration: The BOM may be configured in a way that requires a specific type of task list that is not being used.
    3. System Settings: There may be system settings or configurations that restrict the use of certain task list types with specific BOM usages.

    Solution:

    To resolve the error, consider the following steps:

    1. Check Task List Type: Verify the task list type you are trying to use. Ensure that it is compatible with the BOM's planning and execution usage. You can do this by checking the task list type configuration in the SAP system.

    2. Use Compatible Task List: If the current task list type is not compatible, you may need to select a different task list type that is designed for use with BOMs that have planning and execution usage.

    3. Review BOM Settings: Check the settings of the BOM in question. Ensure that the BOM is correctly configured for the intended use and that it aligns with the task list type you are trying to use.

    4. Consult Documentation: Refer to SAP documentation or help resources for guidance on task list types and their appropriate usages. This can provide insights into which task list types are suitable for your specific BOM configuration.

    5. System Configuration: If necessary, consult with your SAP system administrator or a functional consultant to review the system configuration and make any adjustments that may be needed to allow for the desired task list usage.

    Related Information:

    • Task List Types: Familiarize yourself with the different task list types available in SAP and their specific uses. Common task list types include routing, production version, and others.
    • BOM Usages: Understand the different usages of BOMs in SAP, such as planning, execution, and others, to ensure that you are using the correct combinations.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance on task list and BOM configurations.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.