How To Fix MPE_PLAN_PV071 - Planning BOM should have date eff. BOM usage for non-unitized material


MPE_PLAN_PV071 - Overview

  • Message type: E = Error

  • Message class: MPE_PLAN_PV - Production Version

  • Message number: 071

  • Message text: Planning BOM should have date eff. BOM usage for non-unitized material

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_PLAN_PV071 - Planning BOM should have date eff. BOM usage for non-unitized material ?
    The SAP error message MPE_PLAN_PV071 indicates that there is an issue with the planning Bill of Materials (BOM) for a non-unitized material. Specifically, it suggests that the BOM should have a date-effective BOM usage defined, which is necessary for the planning process.
    
    Cause: Missing BOM Usage: The BOM for the material in question does not have a valid BOM usage defined for the planning period. Date Effectivity: The BOM may not be effective for the date range being used in the planning process. This can happen if the BOM is not valid for the current date or if it has not been maintained correctly. Non-Unitized Material: The error specifically pertains to non-unitized materials, which may have different requirements for BOMs compared to unitized materials.
    Solution: Check BOM Configuration: Go to the BOM transaction (CS02 or CS03) and check the BOM for the material in question. Ensure that the BOM usage is correctly defined and that it is set

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant