Message type: E = Error
Message class: MPE_PLAN_PV - Production Version
Message number: 064
Message text: Validity end date should be equal to &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_PV064
- Validity end date should be equal to &1 ?The SAP error message MPE_PLAN_PV064 indicates that there is an issue with the validity end date in a planning scenario. Specifically, it suggests that the validity end date should match a specified date (represented by &1 in the error message). This error typically arises in the context of planning and forecasting within SAP, particularly in modules like SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO).
Cause: The error is usually caused by one of the following reasons: Mismatch in Dates: The validity end date you have entered does not match the expected date defined in the system or the planning parameters. Incorrect Configuration: There may be a configuration issue in the planning area or the master data that defines the validity periods. Data Entry Error: A simple data entry mistake where the end date was incorrectly inputted.
Solution: To resolve the MPE_PLAN_PV064 error, you can take the following steps: Check Validity Dates: Review the validity
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_PLAN_PV063
Production version does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_PV062
BOM and routing version validity details are incorrect
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_PV065
Production version &1 for material &2 cannot be processed here
What causes this issue? Production version &V1& for material &V2& cannot be processed here.System Response The system issues an erro...
MPE_PLAN_PV066
Production version cannot be maintained here for shop floor routing
What causes this issue? Production version cannot be maintained here for Shop Floor Routing.System Response The system issues an error message and w...
Click on this link to search all SAP messages.