How To Fix MPE_PLAN_PV064 - Validity end date should be equal to &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MPE_PLAN_PV - Production Version

  • Message number: 064

  • Message text: Validity end date should be equal to &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_PLAN_PV064 - Validity end date should be equal to &1 ?

    The SAP error message MPE_PLAN_PV064 indicates that there is an issue with the validity end date in a planning scenario. Specifically, it suggests that the validity end date should match a specified date (represented by &1 in the error message). This error typically arises in the context of planning and forecasting within SAP, particularly in modules like SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO).

    Cause:

    The error is usually caused by one of the following reasons:

    1. Mismatch in Dates: The validity end date you have entered does not match the expected date defined in the system or the planning parameters.
    2. Incorrect Configuration: There may be a configuration issue in the planning area or the master data that defines the validity periods.
    3. Data Entry Error: A simple data entry mistake where the end date was incorrectly inputted.

    Solution:

    To resolve the MPE_PLAN_PV064 error, you can take the following steps:

    1. Check Validity Dates:

      • Review the validity end date you have entered and ensure it matches the expected date indicated by the system (the &1 placeholder).
      • If you are unsure what the expected date is, consult the relevant planning documentation or configuration settings.
    2. Adjust the Dates:

      • If the validity end date is incorrect, update it to match the required date.
      • Ensure that the start and end dates are logically consistent and fall within the allowed planning horizon.
    3. Review Configuration:

      • Check the configuration settings for the planning area or master data to ensure that the validity periods are set up correctly.
      • If necessary, consult with your SAP Basis or configuration team to verify that the settings align with business requirements.
    4. Data Validation:

      • Validate the data being used in the planning process to ensure there are no other discrepancies that could lead to this error.
      • Use transaction codes like /SAPAPO/SDP94 or /SAPAPO/SDP3 to analyze planning data and check for inconsistencies.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for additional context on the error message and its implications.
    6. Seek Support:

      • If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting SAP Notes for any known issues related to this error.

    Related Information:

    • SAP Notes: Check SAP Notes for any specific patches or updates related to this error message.
    • Transaction Codes: Familiarize yourself with relevant transaction codes for planning and master data management in SAP.
    • User Forums: Engage with SAP community forums or user groups for insights from other users who may have encountered similar issues.

    By following these steps, you should be able to identify and resolve the cause of the MPE_PLAN_PV064 error in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant