Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix MPE_PLAN_PV048 - Validity of the versions will be adjusted


MPE_PLAN_PV048 - Overview

  • Message type: E = Error

  • Message class: MPE_PLAN_PV - Production Version

  • Message number: 048

  • Message text: Validity of the versions will be adjusted

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


MPE_PLAN_PV048 - Details

  • The SAP error message MPE_PLAN_PV048, which states "Validity of the versions will be adjusted," typically relates to issues with the planning versions in the SAP system, particularly in the context of SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO). This message indicates that there is a conflict or inconsistency in the validity periods of the planning versions being used.
    
    Cause: Version Overlap: The validity periods of the planning versions may overlap, causing confusion in the system about which version to use for planning. Incorrect Configuration: The planning versions may not be configured correctly, leading to issues with their validity periods. Data Consistency Issues: There may be inconsistencies in the data that are causing the system to adjust the validity of the versions. User Input Errors: Users may have inadvertently created or modified versions with overlapping validity periods.
    Solution: Check Version Validity: Review the validity periods of the planning versions in the system. Ensure

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


MPE_PLAN_PV048 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author