How To Fix MPE_PLAN_PV028 - Distribution key &1 is not valid for plant &2


MPE_PLAN_PV028 - Overview

  • Message type: E = Error

  • Message class: MPE_PLAN_PV - Production Version

  • Message number: 028

  • Message text: Distribution key &1 is not valid for plant &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_PLAN_PV028 - Distribution key &1 is not valid for plant &2 ?
    The SAP error message MPE_PLAN_PV028 indicates that there is an issue with the distribution key being used in the planning process for a specific plant. This error typically arises in the context of Material Requirements Planning (MRP) or production planning when the system cannot find a valid distribution key for the specified plant.
    
    Cause: Invalid Distribution Key: The distribution key specified in the planning run does not exist or is not valid for the specified plant.
    Configuration Issues: The distribution key may not be properly configured in the system for the plant in question. Master Data Issues: The material master or other related master data may not have the correct settings or may be missing necessary information. Plant-Specific Settings: The distribution key may not be assigned to the plant in the configuration settings.
    Solution: Check Distribution Key: Verify that the distribution key specified in the planning run is valid. You can do this by checking the configuration

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author