Do you have any question about this error?
Message type: E = Error
Message class: MPE_PLAN_PV - Production Version
Message number: 019
Message text: Maximum lot size value should be greater than minimum lot size
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_PV019
- Maximum lot size value should be greater than minimum lot size ?The SAP error message MPE_PLAN_PV019 indicates that there is an issue with the lot size configuration for a material in the planning process. Specifically, it states that the maximum lot size value must be greater than the minimum lot size value. This error typically arises during the planning or production scheduling processes when the system checks the lot size parameters for a material.
Cause:
The error occurs due to the following reasons:
- Incorrect Lot Size Configuration: The maximum lot size is set to a value that is less than or equal to the minimum lot size in the material master or in the planning parameters.
- Data Entry Error: During the setup of the material master or planning parameters, incorrect values may have been entered.
- Master Data Issues: The material master data may not be properly maintained, leading to inconsistencies in the lot size settings.
Solution:
To resolve the error, you can follow these steps:
Check Material Master Data:
- Go to the material master record (transaction code
MM02
for change).- Navigate to the relevant views (e.g., MRP view) and check the lot size settings.
- Ensure that the maximum lot size is greater than the minimum lot size.
Adjust Lot Size Values:
- If the maximum lot size is less than or equal to the minimum lot size, update the values accordingly.
- For example, if the minimum lot size is set to 100 and the maximum lot size is set to 100, change the maximum lot size to a value greater than 100 (e.g., 200).
Review Planning Parameters:
- Check the planning parameters in the MRP settings to ensure they are correctly configured.
- Make sure that any related settings (like lot size categories) are also correctly defined.
Save Changes:
- After making the necessary adjustments, save the changes to the material master.
Re-run Planning:
- After correcting the lot size values, re-run the planning process to see if the error persists.
Related Information:
By following these steps, you should be able to resolve the MPE_PLAN_PV019 error and ensure that your lot size settings are correctly configured for effective planning in SAP.
Get instant SAP help. Start your 7-day free trial now.
MPE_PLAN_PV018
Production version &1 already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_PV017
Material &1 is not found in plant &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_PV020
Valid to date should not be smaller than the valid from date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_PV021
Enter a material number
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.