How To Fix MPE_PLAN_PV009 - Change number is outside the validity period of the production version


MPE_PLAN_PV009 - Overview

  • Message type: E = Error

  • Message class: MPE_PLAN_PV - Production Version

  • Message number: 009

  • Message text: Change number is outside the validity period of the production version

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_PLAN_PV009 - Change number is outside the validity period of the production version ?
    The SAP error message MPE_PLAN_PV009 indicates that a change number you are trying to use is outside the validity period of the production version. This typically occurs in the context of production planning and control, where production versions are used to define how a product is manufactured, including the materials and processes involved.
    
    Cause: Validity Period: Each production version has a defined validity period. If the change number you are trying to use is not within this period, the system will throw this error. Change Management: The change number may refer to a change that is not applicable to the current production version due to timing or other constraints. Incorrect Configuration: The production version may not be correctly configured to accept the change number you are trying to apply.
    Solution: Check Validity Period: Verify the validity period of the production version in question. You can do this by navigating to the production version in the material

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker