Message type: E = Error
Message class: MPE_PLAN_MEC - Message Class for Manufacturing Engineering Cockpit
Message number: 039
Message text: Planning scope is not valid
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_MEC039
- Planning scope is not valid ?The SAP error message MPE_PLAN_MEC039 indicates that the planning scope you are trying to use is not valid. This error typically occurs in the context of SAP's planning applications, such as SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO). Causes: Invalid Planning Scope: The planning scope you are trying to access may not exist or may have been deleted or modified. Authorization Issues: The user may not have the necessary authorizations to access the specified planning scope.
Configuration Issues: There may be configuration issues in the planning area or planning scope settings. Data Consistency: There may be inconsistencies in the data related to the planning scope, such as missing master data or incorrect settings. Solutions: Verify Planning Scope: Check if the planning scope you are trying to use is correctly defined in the system. Ensure that the planning scope is active and has not been deleted or modified. Check Authorizations: Ensure that the user has the necessary
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_PLAN_MEC038
EBOM &1 is not valid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC037
Change relevance Delete or linked to Delete not configured
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC040
Object type not configured
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_MEC041
Routing version is not the latest; change relevance New not applicable
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.