How To Fix MPE_PLAN_MEC036 - Change relevance Update or linked to Update not configured


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MPE_PLAN_MEC - Message Class for Manufacturing Engineering Cockpit

  • Message number: 036

  • Message text: Change relevance Update or linked to Update not configured

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_PLAN_MEC036 - Change relevance Update or linked to Update not configured ?

    The SAP error message MPE_PLAN_MEC036 typically indicates that there is an issue with the configuration of change relevance for a specific planning scenario or data model in SAP. This error often arises in the context of SAP Integrated Business Planning (IBP) or SAP S/4HANA when trying to execute a planning function or process that requires certain configurations to be in place.

    Cause:

    The error message "Change relevance Update or linked to Update not configured" suggests that the system is unable to determine how changes to the data should be handled because the necessary configuration for change relevance is missing or not properly set up. This can occur due to:

    1. Missing Configuration: The planning area or data model may not have the required change relevance settings configured.
    2. Incorrect Settings: The settings that are configured may not align with the requirements of the planning function or process being executed.
    3. Data Model Issues: There may be issues with the underlying data model that prevent the system from processing updates correctly.

    Solution:

    To resolve the MPE_PLAN_MEC036 error, you can follow these steps:

    1. Check Change Relevance Configuration:

      • Navigate to the relevant planning area or data model in SAP IBP or S/4HANA.
      • Verify that the change relevance settings are correctly configured for the key figures and attributes involved in the planning function.
    2. Review Planning Functions:

      • Ensure that the planning functions you are trying to execute are properly linked to the change relevance settings.
      • Check if the planning function requires specific change relevance settings that are not currently configured.
    3. Consult Documentation:

      • Refer to the SAP documentation for your specific version of IBP or S/4HANA to understand the requirements for change relevance configuration.
      • Look for any notes or updates from SAP that may address known issues related to this error.
    4. Test with Sample Data:

      • If possible, create a test scenario with sample data to see if the error persists. This can help isolate whether the issue is with specific data or a broader configuration problem.
    5. Contact SAP Support:

      • If you are unable to resolve the issue through configuration changes, consider reaching out to SAP Support for assistance. Provide them with details about the error, the context in which it occurs, and any steps you have already taken to troubleshoot.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may provide additional insights or fixes related to this error.
    • SAP Community: Engage with the SAP Community forums to see if other users have encountered similar issues and what solutions they have found.
    • Training and Documentation: Consider reviewing training materials or documentation related to SAP IBP or S/4HANA change relevance and planning functions to enhance your understanding of the configuration requirements.

    By following these steps, you should be able to identify and resolve the underlying cause of the MPE_PLAN_MEC036 error.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker