Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix MPE_PLAN_EXEC026 - Date effective BOM with phantom assembly is not supported


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MPE_PLAN_EXEC - Message Class for Planning to Execution

  • Message number: 026

  • Message text: Date effective BOM with phantom assembly is not supported

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_PLAN_EXEC026 - Date effective BOM with phantom assembly is not supported ?

    The SAP error message MPE_PLAN_EXEC026 indicates that there is an issue with the Bill of Materials (BOM) when trying to execute a planning or production process involving a phantom assembly. A phantom assembly is a type of assembly that is not physically stocked but is used in the production process to simplify the BOM structure.

    Cause:

    The error typically arises due to the following reasons:

    1. Date-Effective BOM: The BOM being used is date-effective, meaning it has validity periods defined for its components. This can lead to complications when trying to process phantom assemblies, as the system may not be able to determine the correct components to use based on the date.

    2. Phantom Assembly Configuration: The configuration of the phantom assembly in the BOM may not be set up correctly, or the system may not support the combination of date-effective BOMs with phantom assemblies.

    3. Planning Parameters: The planning parameters or settings in the system may not be compatible with the use of phantom assemblies in conjunction with date-effective BOMs.

    Solution:

    To resolve the error, consider the following steps:

    1. Check BOM Configuration:

      • Review the BOM for the phantom assembly to ensure it is correctly configured. Make sure that the components are properly defined and that the phantom assembly is set up as intended.
    2. Review Date-Effective BOM Settings:

      • Check the validity dates of the BOM components. Ensure that the date-effective BOM is valid for the date on which you are trying to execute the planning or production process.
    3. Use Standard BOM:

      • If possible, consider using a standard BOM instead of a date-effective BOM for the phantom assembly. This may help bypass the limitations associated with date-effective BOMs.
    4. Consult SAP Documentation:

      • Refer to SAP documentation or notes related to BOMs and phantom assemblies. There may be specific guidelines or limitations documented that can provide further insights.
    5. System Configuration:

      • Check the system configuration settings related to BOM processing and planning. Ensure that the settings allow for the use of phantom assemblies with date-effective BOMs, if applicable.
    6. Contact SAP Support:

      • If the issue persists, consider reaching out to SAP support for assistance. They may provide specific patches or updates that address this issue.

    Related Information:

    • Phantom Assemblies: Understand the concept of phantom assemblies in SAP and how they are used in BOMs.
    • BOM Types: Familiarize yourself with different types of BOMs in SAP, including standard BOMs, variant BOMs, and date-effective BOMs.
    • Planning Processes: Review the planning processes in SAP, including MRP (Material Requirements Planning) and how BOMs are utilized in these processes.

    By following these steps and understanding the underlying concepts, you should be able to address the error message MPE_PLAN_EXEC026 effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant