Do you have any question about this error?
Message type: E = Error
Message class: MPE_PLAN_EXEC - Message Class for Planning to Execution
Message number: 003
Message text: No released planning BOM found
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_EXEC003
- No released planning BOM found ?The SAP error message MPE_PLAN_EXEC003: No released planning BOM found typically occurs in the context of production planning and execution when the system is unable to find a valid, released Bill of Materials (BOM) for a specific material or product. This can hinder production planning processes, as the system relies on BOMs to determine the components required for manufacturing.
Causes:
- No BOM Exists: The most straightforward cause is that there is no BOM created for the material in question.
- BOM Not Released: The BOM exists but has not been released. Only released BOMs can be used in production planning.
- Incorrect Material Master Data: The material master data may not be correctly set up, leading to issues in BOM assignment.
- Plant-Specific BOM: The BOM may not be available for the specific plant or location where the production is being planned.
- Versioning Issues: If there are multiple versions of the BOM, the system may be looking for a specific version that is not available or released.
- Authorization Issues: The user may not have the necessary authorizations to view or access the BOM.
Solutions:
- Check BOM Existence: Verify if a BOM exists for the material using transaction code CS03 (Display BOM). If it does not exist, you will need to create one using CS01 (Create BOM).
- Release the BOM: If the BOM exists but is not released, you can release it using transaction code CS02 (Change BOM) and then select the release option.
- Verify Material Master Data: Check the material master data using transaction code MM03 (Display Material) to ensure that the BOM is correctly assigned to the material.
- Check Plant Assignment: Ensure that the BOM is assigned to the correct plant. You can do this in the BOM details.
- Review BOM Versions: If there are multiple versions of the BOM, ensure that the correct version is released and available for use.
- Authorization Check: Ensure that the user has the necessary authorizations to access the BOM. This may require coordination with your SAP security team.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
MPE_PLAN_EXEC002
No date effective BOM found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_EXEC001
No valid source BOMs found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_EXEC004
No changes found between planning BOM and shop floor BOM
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_EXEC005
Invalid BOM details
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.