How To Fix MPE_PLAN_ENG_SNPSHT019 - Change preparation not initiated


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MPE_PLAN_ENG_SNPSHT - Message class for Engineering Snapshots

  • Message number: 019

  • Message text: Change preparation not initiated

  • Show details Hide details
  • What causes this issue?

    The snapshot was not prepared for the change cycle due to one of the
    following reasons:
    No relevant changes were found between this snapshot and the last
    revision considered for change.
    A relevant planning scope could not be determined for all the changed
    EBOMs.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_PLAN_ENG_SNPSHT019 - Change preparation not initiated ?

    The SAP error message MPE_PLAN_ENG_SNPSHT019: Change preparation not initiated typically occurs in the context of SAP's planning and engineering applications, particularly when dealing with planning scenarios or snapshots. This error indicates that the system was unable to initiate the change preparation process for a planning scenario.

    Causes:

    1. Missing Configuration: The planning scenario may not be properly configured, leading to the inability to initiate change preparation.
    2. Authorization Issues: The user may not have the necessary authorizations to perform the change preparation.
    3. System Lock: There may be a lock on the planning scenario or related objects, preventing changes from being made.
    4. Technical Issues: There could be underlying technical issues, such as database inconsistencies or system errors.
    5. Incorrect Data: The data being processed may not meet the required criteria for change preparation.

    Solutions:

    1. Check Configuration: Verify that the planning scenario is correctly configured. Ensure that all necessary settings and parameters are in place.
    2. Review Authorizations: Check the user’s authorizations to ensure they have the necessary permissions to initiate change preparation.
    3. Release Locks: If there are locks on the planning scenario, identify and release them. This may involve checking for other users or processes that are currently accessing the scenario.
    4. System Logs: Review system logs (transaction codes like SLG1) for any additional error messages or warnings that could provide more context about the issue.
    5. Data Validation: Ensure that the data being used for the planning scenario is valid and meets all necessary criteria.
    6. Consult Documentation: Refer to SAP documentation or notes related to the specific planning application you are using for any known issues or additional troubleshooting steps.
    7. Contact SAP Support: If the issue persists, consider reaching out to SAP support for further assistance, especially if it appears to be a technical issue.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SAPAPO/SDP94 for planning and /SAPAPO/MC90 for planning area configuration.
    • SAP Notes: Search for SAP Notes related to the error message for any patches or updates that may resolve the issue.
    • Community Forums: Engage with SAP community forums or user groups where similar issues may have been discussed.

    By following these steps, you should be able to diagnose and resolve the error message MPE_PLAN_ENG_SNPSHT019 effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant