How To Fix MPE_PLAN_ENG_SNPSHT014 - Eng. change cycle prepared for matl &1, plant &2, usage &3, alt. BOM &4


MPE_PLAN_ENG_SNPSHT014 - Overview

  • Message type: E = Error

  • Message class: MPE_PLAN_ENG_SNPSHT - Message class for Engineering Snapshots

  • Message number: 014

  • Message text: Eng. change cycle prepared for matl &1, plant &2, usage &3, alt. BOM &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_PLAN_ENG_SNPSHT014 - Eng. change cycle prepared for matl &1, plant &2, usage &3, alt. BOM &4 ?
    The SAP error message MPE_PLAN_ENG_SNPSHT014 indicates that there is an issue related to the engineering change cycle for a specific material, plant, usage, and alternative Bill of Materials (BOM). This message typically arises in the context of production planning and material management when there are discrepancies or issues with the engineering change management process.
    
    Cause: Engineering Change Management Issues: The error may occur if there are pending changes in the engineering change management process that have not been fully processed or released. BOM Configuration: There may be issues with the configuration of the alternative BOM or the usage of the BOM in the specified plant. Material Master Data: The material master data may not be correctly set up for the specified plant or usage. Change Cycle Status: The engineering change cycle may be in a status that does not allow for planning or production activities.
    Solution: Check Engineering Change Status: Review the status of the engineering change

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant