How To Fix MPE_OAN039 - Elements of operation activity network &1 are not connected


MPE_OAN039 - Overview

  • Message type: E = Error

  • Message class: MPE_OAN - Operation Activity Network Messages

  • Message number: 039

  • Message text: Elements of operation activity network &1 are not connected

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


MPE_OAN039 - Details

  • The SAP error message MPE_OAN039, which states "Elements of operation activity network &1 are not connected," typically occurs in the context of project management or production planning within SAP. This error indicates that there are elements (such as activities, milestones, or tasks) in the operation activity network that are not properly linked or connected to each other, which is essential for the system to understand the sequence and dependencies of operations.
    
    Cause: Missing Dependencies: The activities in the network may not have the necessary predecessor or successor relationships defined. Incorrect Configuration: The configuration of the operation activity network may be incorrect, leading to disconnections. Data Entry Errors: Manual entry errors during the creation or modification of the operation activity network can lead to missing connections. Incomplete Network Definition: The network may not be fully defined, with some elements lacking the required connections.
    Solution: Check Network Structure: Review the operation activity network to ensure that all activities are

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


MPE_OAN039 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant