Do you have any question about this error?
Message type: E = Error
Message class: MPE_MIGRATION_MSG -
Message number: 039
Message text: Target BOM usage is not version controlled
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_MIGRATION_MSG039
- Target BOM usage is not version controlled ?The SAP error message MPE_MIGRATION_MSG039 indicates that the target Bill of Materials (BOM) usage is not version controlled. This typically occurs during the migration or conversion process when the system expects a version-controlled BOM but finds that the target BOM usage does not have version control enabled.
Cause:
- BOM Configuration: The target BOM usage is set up in a way that does not support version control. This can happen if the BOM is created without the versioning feature or if the configuration settings for BOM usage do not require version control.
- Migration Process: During a migration or data transfer process, the system may be trying to map or convert BOMs that are expected to be version-controlled, but the target BOMs are not set up accordingly.
Solution:
- Check BOM Settings: Review the configuration settings for the BOM in the target system. Ensure that the BOM usage is set to be version-controlled. This can typically be done in the BOM configuration settings in SAP.
- Create Version-Controlled BOM: If the target BOM is not version-controlled, you may need to create a new BOM that is version-controlled. This can be done by:
- Going to the BOM creation transaction (e.g., CS01).
- Ensuring that the version control option is selected when creating the BOM.
- Adjust Migration Settings: If you are using a migration tool or process, check the settings to ensure that it is correctly configured to handle BOMs with version control.
- Consult Documentation: Refer to SAP documentation or notes related to BOM version control and migration processes for specific guidance and best practices.
Related Information:
By following these steps, you should be able to resolve the error and ensure that your BOMs are correctly configured for version control.
Get instant SAP help. Start your 7-day free trial now.
MPE_MIGRATION_MSG038
Routing not found for entered material(s) &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_MIGRATION_MSG037
BOM &1 for material &2 has been migrated successfully
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_MIGRATION_MSG040
Configurable material &1 cannot be migrated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_MIGRATION_MSG041
Phantom material &1 cannot be migrated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.