Message type: E = Error
Message class: MPE_INSTALLATION_MSG -
Message number: 034
Message text: Component assigned to activity without reference point
You manually assigned the BOM item to a network activity or you created
the network directly from the BOM.
The advantage of using reference points is that you do not have to
manually assign BOM items to network activities in the BOM transfer.
If you intend to copy networks, consider using reference points to avoid
having to assign BOM items manually for every end-item unit.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MPE_INSTALLATION_MSG034
- Component assigned to activity without reference point ?The SAP error message MPE_INSTALLATION_MSG034 with the description "Component assigned to activity without reference point" typically occurs in the context of project management or maintenance planning within SAP. This error indicates that a component (such as a material or resource) has been assigned to an activity, but there is no reference point defined for that assignment. This can lead to issues in planning, scheduling, or executing tasks.
Causes:
- Missing Reference Point: The component is linked to an activity that does not have a defined reference point, which is necessary for proper tracking and execution.
- Configuration Issues: There may be configuration settings in the project or maintenance planning module that are not set up correctly.
- Data Inconsistencies: There could be inconsistencies in the master data related to the components or activities.
- Incorrect Assignment: The component may have been incorrectly assigned to the activity without the necessary prerequisites being met.
Solutions:
- Check Reference Points: Ensure that the activity to which the component is assigned has a valid reference point defined. This may involve reviewing the project structure or maintenance plan.
- Review Component Assignment: Verify that the component is correctly assigned to the activity and that all necessary prerequisites are met.
- Configuration Review: Check the configuration settings in the relevant SAP modules (like Project System or Plant Maintenance) to ensure they are set up correctly.
- Data Validation: Validate the master data for both the component and the activity to ensure there are no inconsistencies or missing information.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the error message and related configuration settings.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
MPE_INSTALLATION_MSG033
Referenced activity does not exist
What causes this issue? A component demand or reservation references a network activity that does not exist.System Response Every demand for an inst...
MPE_INSTALLATION_MSG032
Component not assigned to activity
What causes this issue? A component demand or reservation was created for the BOM item but not assigned to a network activity.System Response Every ...
MPE_INSTALLATION_MSG035
Component assigned to activity with wrong reference point
What causes this issue? One of the following applies: The production engineer manually assigned the component to an individually selected network act...
MPE_INSTALLATION_MSG036
Component not assigned to activity
What causes this issue? Why is it relevant? Every demand for an installation kit should be assigned to a network activity to define the sequence in w...