Do you have any question about this error?
Message type: E = Error
Message class: MPE_CM_EFFECTIVITY - Message Class for Parameter Effectivity
Message number: 060
Message text: ECN &1 is not unitized
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_CM_EFFECTIVITY060
- ECN &1 is not unitized ?The SAP error message MPE_CM_EFFECTIVITY060 indicates that the Engineering Change Number (ECN) specified is not unitized. This typically occurs in the context of managing engineering changes in SAP, particularly when dealing with effectivity and change management processes.
Cause:
The error arises when the system expects the ECN to be associated with a specific unit of measure or a unitized status, but it is not. This can happen due to several reasons:
- Missing Unitization: The ECN has not been properly unitized in the system.
- Configuration Issues: There may be configuration settings in the SAP system that are not set up correctly for handling ECNs.
- Data Entry Errors: The ECN may have been entered incorrectly or may not exist in the system.
- Master Data Issues: Related master data (like materials or BOMs) may not be correctly linked to the ECN.
Solution:
To resolve this error, you can take the following steps:
Check ECN Status: Verify that the ECN you are trying to use is correctly defined and unitized in the system. You can do this by navigating to the relevant transaction (e.g.,
CC01
for creating change documents) and checking the details of the ECN.Unitization Process: If the ECN is not unitized, you may need to perform the unitization process. This typically involves:
- Accessing the ECN in the change management module.
- Ensuring that all necessary components and materials are associated with the ECN.
- Confirming that the ECN is linked to the appropriate units of measure.
Review Configuration: Check the configuration settings related to change management and effectivity in your SAP system. Ensure that all necessary settings are in place for handling ECNs.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing ECNs and effectivity.
Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance based on your system's configuration.
Related Information:
CC01
, CC02
, and CC03
for creating, changing, and displaying change documents.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
MPE_CM_EFFECTIVITY059
ECN &1 is not genarated by ECN factory
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_CM_EFFECTIVITY058
Error in reading parameter variant
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_CM_EFFECTIVITY061
Effectivity type &1 is not unitized
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_CM_EFFECTIVITY062
The BOM item is partially planned.
What causes this issue? The BOM item is partially planned. Click on 'BOM item Coverage' to see more details.System Response The system iss...
Click on this link to search all SAP messages.