How To Fix MPE_AHF_TH_MSG050 - The processed quantity exceeds the planned quantity of the rework OA


MPE_AHF_TH_MSG050 - Overview

  • Message type: E = Error

  • Message class: MPE_AHF_TH_MSG - Message Class - Type Handler Messages

  • Message number: 050

  • Message text: The processed quantity exceeds the planned quantity of the rework OA

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_AHF_TH_MSG050 - The processed quantity exceeds the planned quantity of the rework OA ?
    The SAP error message MPE_AHF_TH_MSG050 indicates that the processed quantity of a rework order (OA) exceeds the planned quantity. This typically occurs in manufacturing or production environments where rework orders are used to correct or modify products that do not meet quality standards.
    
    Cause: Excess Processing: The primary cause of this error is that the quantity of items processed in the rework order exceeds the quantity that was originally planned. This can happen if: More items were found to be defective than anticipated. The rework process was not properly monitored, leading to over-processing. Incorrect data entry during the rework process.
    Configuration Issues: There may be issues with how the rework order is configured in the system, such as incorrect settings for planned quantities. Data Entry Errors: Manual entry errors during the creation or processing of the rework order can lead to discrepancies between planned and actual quantities.
    Solution: Review the Rework Order: Check the details of the rework order

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author