Do you have any question about this error?
Message type: E = Error
Message class: MPD - Message Class for A&D MPD
Message number: 207
Message text: MP_START
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPD207
- MP_START ?The SAP error message MPD207 with the description "MP_START" typically relates to issues in the Material Planning (MP) process, particularly when starting a planning run or a similar operation. This error can occur due to various reasons, and understanding the cause is essential for finding a solution.
Possible Causes:
- Configuration Issues: Incorrect settings in the planning parameters or master data can lead to this error.
- Missing Master Data: Required master data (like material master, BOM, routing) may be incomplete or missing.
- Locking Issues: Another user or process may have locked the planning run, preventing it from starting.
- Authorization Problems: The user may not have the necessary authorizations to execute the planning run.
- System Performance: If the system is under heavy load, it may not be able to start the planning process.
Solutions:
- Check Configuration: Review the configuration settings for the planning run. Ensure that all necessary parameters are correctly set.
- Verify Master Data: Ensure that all required master data is complete and accurate. Check the material master, BOM, and routing for the materials involved.
- Check Locks: Use transaction codes like SM12 to check for any locks on the planning run. If locks are found, determine if they can be released.
- Review Authorizations: Ensure that the user executing the planning run has the necessary authorizations. This can be checked in transaction SU53 or by consulting with your security team.
- Monitor System Performance: Check system performance and load. If the system is slow, consider running the planning process during off-peak hours.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
MPD206
MP_UPDATE
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPD205
MP_CREATE
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPD208
MP_RESTART
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPD209
MP_EFFECTIVITY
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.