Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix MN549 - Updating for sched. agmt. with master conditions only from material doc.


MN549 - Overview

  • Message type: E = Error

  • Message class: MN - Message class for subsequent settlement (Purchasing)

  • Message number: 549

  • Message text: Updating for sched. agmt. with master conditions only from material doc.

  • Show details Hide details
  • What causes this issue?

    The price determination process for scheduling agreements with master
    conditions takes place at the time of goods receipt. The updating of
    supplier business volumes for the purposes of
    <DS:GLOS.3526C095AFAB52B9E10000009B38F974>subsequent settlement</> can
    therefore only take place on the basis of the data from the material
    document.
    At the time a document is created or changed, and at the time of invoice
    receipt, the document conditions are not known.

    System Response

    The updating of supplier business volumes direct from the scheduling
    agreement (&V1&) or at the time of invoice receipt is not possible.

    How to fix this error?

    Contact your system administrator. A program error has occurred.

    Procedure for System Administrators

    Function module &V2& was wrongly invoked.

    Error message extract from SAP system. Copyright SAP SE.


MN549 - Details

  • The SAP error message MN549 typically occurs when there is an issue with updating a scheduling agreement that is linked to master conditions, specifically when the update is being attempted from a material document. This error can arise in various scenarios, such as during the goods receipt process or when trying to update the scheduling agreement based on material movements.
    
    Cause: Master Conditions: The scheduling agreement may be set up with master conditions that are not compatible with the current update being attempted. Document Type: The document type of the material document may not be allowed to update the scheduling agreement. Inconsistent Data: There may be inconsistencies in the data between the material document and the scheduling agreement.
    Configuration Issues: There could be configuration issues in the system related to the handling of scheduling agreements and material documents.
    Solution: Check Master Conditions: Review the master conditions associated with the scheduling agreement to ensure they are correctly set

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


MN549 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author