How To Fix MMRP01612 - No capacity available for station &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MMRP01 - Rapid Planning Matrix

  • Message number: 612

  • Message text: No capacity available for station &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MMRP01612 - No capacity available for station &1 ?

    The SAP error message MMRP01612, which states "No capacity available for station &1," typically occurs in the context of production planning and scheduling. This error indicates that there is no available capacity at the specified work center (station) to accommodate the planned production order or operation.

    Causes:

    1. Capacity Overload: The work center may already be fully booked with other production orders, leading to a situation where no additional capacity is available.
    2. Incorrect Capacity Planning: The capacity settings for the work center may not be configured correctly, leading to discrepancies in available capacity.
    3. Scheduling Conflicts: There may be scheduling conflicts due to overlapping production orders or maintenance activities that occupy the work center.
    4. Resource Availability: The resources (machines, labor) associated with the work center may not be available due to maintenance, breakdowns, or other reasons.
    5. Capacity Type: The capacity type defined for the work center may not match the requirements of the production order.

    Solutions:

    1. Review Capacity Planning: Check the capacity planning for the work center to ensure that it is set up correctly. This includes reviewing the available capacity, working hours, and any planned downtimes.
    2. Adjust Production Orders: If the work center is overloaded, consider rescheduling or adjusting the production orders to balance the load across available work centers.
    3. Check Resource Availability: Ensure that all resources associated with the work center are available and not undergoing maintenance or repairs.
    4. Modify Scheduling Parameters: Adjust the scheduling parameters in the production order to allow for more flexibility in capacity allocation.
    5. Use Alternative Work Centers: If possible, consider using alternative work centers that have available capacity to fulfill the production requirements.
    6. Capacity Evaluation: Use transaction codes like CM01 (Capacity Planning) or CM21 (Capacity Leveling) to analyze and evaluate the capacity situation.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CO01 (Create Production Order), CO02 (Change Production Order), and CM01/CM21 for capacity planning.
    • Work Center Configuration: Review the configuration of the work center in transaction CR01 or CR02 to ensure that it is set up correctly with the right capacity and scheduling parameters.
    • Capacity Evaluation Reports: Utilize reports like S031 (Capacity Evaluation) to analyze capacity utilization and identify potential issues.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to capacity planning and scheduling.

    By following these steps, you should be able to identify the root cause of the MMRP01612 error and implement the necessary solutions to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant