Message type: E = Error
Message class: MMRP01 - Rapid Planning Matrix
Message number: 514
Message text: Scheduling using resource &1 is not possible
A component has been assigned to the line resource &V1& in the line
balance. However, you cannot schedule using this resource.
This component is set to individual scheduling in the planning matrix.
Check the capacity parameters for resource &V1&.
Check whether the range of coverage for the time stream of the
resource is large enough - that means larger than the range
of coverage in the period profile &V2&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MMRP01514
- Scheduling using resource &1 is not possible ?The SAP error message MMRP01514 indicates that scheduling using a specific resource (denoted as &1) is not possible. This error typically arises in the context of production planning and scheduling within SAP, particularly when dealing with capacity planning and resource allocation.
Causes:
- Resource Unavailability: The resource specified may not be available for the requested time period due to maintenance, holidays, or other scheduling conflicts.
- Capacity Constraints: The resource may have reached its maximum capacity, preventing any additional scheduling.
- Incorrect Resource Configuration: The resource may not be properly configured in the system, leading to scheduling issues.
- Time Period Issues: The scheduling request may fall outside the defined working hours or availability of the resource.
- Locking Issues: The resource might be locked by another process or user, preventing scheduling.
Solutions:
- Check Resource Availability: Verify the availability of the resource for the requested time period. You can do this by checking the resource calendar and ensuring that it is not marked as unavailable.
- Review Capacity Settings: Check the capacity settings for the resource to ensure that it has not reached its limits. You may need to adjust the capacity or redistribute workloads.
- Resource Configuration: Ensure that the resource is correctly configured in the system. This includes checking the master data for the resource and ensuring that all necessary parameters are set correctly.
- Adjust Scheduling Parameters: If the scheduling request is outside the resource's working hours, consider adjusting the scheduling parameters or the request itself to fit within the available time.
- Check for Locks: Investigate if the resource is locked by another process. If so, you may need to wait for the lock to be released or resolve the conflict.
- Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message and additional troubleshooting steps.
Related Information:
CM01
(Capacity Planning) or CM21
(Capacity Leveling) to analyze resource availability and capacity.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
MMRP01513
Resource assignment to variant &1 does not exist
What causes this issue? In iPPE, no valid line resources can be determined for the component &V1&.System Response This component is not tran...
MMRP01512
Peg area &1 not found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MMRP01515
Product &1 does not exist in location &2
What causes this issue? A product/location combination could not be determined.System Response The system issues an error message and will not allow...
MMRP01516
An error has caused the RPM run to be canceled
What causes this issue? The other messages give you the cause.System Response All changes are rejected. The rapid planning matrix is not created.How...