Do you have any question about this error?
Message type: E = Error
Message class: MMRP01 - Rapid Planning Matrix
Message number: 028
Message text: RPM has not been activated for product &1 in location &2
Product &V1& in location &V2& is not flagged for planning with the RPM.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Enter indicator <LS>4 for exploding iPPE with the RPM</> in the
Explosion field on tab page PP/DS in the product master.
You can use the <DS:TRAN.MDRPM>Additional Data for RPM Products</>
transaction to enter additional parameters.
Error message extract from SAP system. Copyright SAP SE.
MMRP01028
- RPM has not been activated for product &1 in location &2 ?The SAP error message MMRP01028 indicates that the "Replenishment Planning" (RPM) has not been activated for a specific product in a given location. This error typically arises in the context of materials management and inventory control within SAP, particularly when trying to perform operations related to replenishment planning.
Cause:
The error occurs when:
- The Replenishment Planning (RPM) functionality has not been activated for the specified product (material) in the specified location (plant/storage location).
- The product may not be set up correctly in the system for replenishment planning.
- The necessary configuration settings for RPM may not have been completed in the system.
Solution:
To resolve the MMRP01028 error, you can follow these steps:
Check RPM Activation:
- Go to the material master record for the product in question.
- Navigate to the "MRP" (Material Requirements Planning) view.
- Ensure that the "Replenishment Planning" checkbox is activated for the relevant plant/storage location.
Activate RPM:
- If RPM is not activated, you can activate it by:
- Going to the transaction code
MM02
(Change Material).- Enter the material number and select the relevant plant/storage location.
- In the MRP view, check the settings and activate the RPM if necessary.
Configuration Settings:
- Ensure that the necessary configuration for RPM is done in the system. This may involve:
- Checking the configuration in the Customizing settings (transaction code
SPRO
).- Navigating to the relevant sections for Material Management and Replenishment Planning to ensure all settings are correctly configured.
Check Master Data:
- Verify that all relevant master data (like vendor, purchasing info records, etc.) is correctly set up for the product and location.
Consult Documentation:
- If you are unsure about the settings or the process, refer to SAP documentation or consult with your SAP support team for guidance.
Related Information:
Transaction Codes:
MM02
: Change Material MasterMM03
: Display Material MasterSPRO
: Customizing Implementation GuideSAP Notes:
User Roles:
By following these steps, you should be able to resolve the MMRP01028 error and successfully activate the Replenishment Planning for the specified product and location.
Get instant SAP help. Start your 7-day free trial now.
MMRP01027
Unknown error has occurred in the liveCache (no. &)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MMRP01026
Data error: No suitable row found in the characteristic value matrix
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MMRP01029
Lock request in liveCache has timed out
What causes this issue? The RPM is blocked by another process at the moment.System Response The system does not allow the requested operation.How to...
MMRP01030
Planning file entries have been generated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.