Do you have any question about this error?
Message type: E = Error
Message class: MM - Messages for material master maintenance and Customizing
Message number: 221
Message text: Maintain the planning calendar for the plant or for its reference plant
You have chosen an MRP lot size that requires you to specify a planning
calendar. However, no planning calendar exists for the plant specified
or for its reference plant.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
INCLUDE OMT4 OBJECT DOKU ID TX LANGUAGE EN
In the standard SAP system, it appears as an error message.
Error message extract from SAP system. Copyright SAP SE.
MM221
- Maintain the planning calendar for the plant or for its reference plant ?The SAP error message MM221 indicates that there is an issue with the planning calendar for a specific plant or its reference plant in the Materials Management (MM) module. This error typically arises when the system cannot find a valid planning calendar for the plant in question, which is necessary for various planning and scheduling functions.
Cause:
- Missing Planning Calendar: The planning calendar for the specified plant has not been defined or is missing.
- Incorrect Plant Configuration: The plant may not be properly configured in the system, leading to the absence of a planning calendar.
- Reference Plant Issues: If the plant is set to use a reference plant's calendar, the reference plant may also lack a defined planning calendar.
- Authorization Issues: The user may not have the necessary permissions to view or maintain the planning calendar.
Solution:
To resolve the MM221 error, follow these steps:
Check Planning Calendar Configuration:
- Navigate to the configuration settings for the planning calendar in SAP.
- Use transaction code SPRO to access the SAP Reference IMG.
- Go to Logistics - General > Planning > Maintain Planning Calendar.
- Ensure that a planning calendar is defined for the specific plant.
Define a New Planning Calendar:
- If no planning calendar exists, create a new one by specifying the required parameters (e.g., working days, holidays).
- Assign the newly created planning calendar to the relevant plant.
Check Reference Plant:
- If the plant is using a reference plant, ensure that the reference plant has a valid planning calendar defined.
- You can check this in the same configuration area.
Review Plant Settings:
- Verify the plant settings in the material master or plant configuration to ensure that the correct planning calendar is assigned.
Authorization Check:
- Ensure that the user has the necessary authorizations to maintain the planning calendar. If not, contact your SAP security administrator to grant the required permissions.
Testing:
- After making the necessary changes, test the configuration by attempting to perform the action that triggered the error again.
Related Information:
By following these steps, you should be able to resolve the MM221 error and ensure that the planning calendar is correctly set up for the plant in question.
Get instant SAP help. Start your 7-day free trial now.
MM220
The work scheduler group &2 does not exist for plant &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MM219
The scheduling margin key &2 does not exist for plant &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MM222
The control key & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MM223
The loading group & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.