Do you have any question about this error?
Message type: E = Error
Message class: MM - Messages for material master maintenance and Customizing
Message number: 172
Message text: Lot size independent in-house production time will be reset
You have specified a lot size <ZH>dependent</> in-house production
time. A lot size <ZH>independent</> in-house production time was
previously assigned to the material.
The system cancels the lot size independent in-house production time.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MM172
- Lot size independent in-house production time will be reset ?The SAP error message MM172, which states "Lot size independent in-house production time will be reset," typically occurs in the context of Material Management (MM) and Production Planning (PP) modules. This message indicates that there is an issue with the configuration of the in-house production time for a material, particularly when it is set to be independent of lot size.
Cause:
- Configuration Issues: The in-house production time may have been set incorrectly in the material master or in the production scheduling profile.
- Lot Size Settings: The system may be trying to apply a lot size-dependent production time to a material that is configured for lot size-independent production time.
- Master Data Inconsistencies: There may be inconsistencies in the material master data, such as the production version or routing not being properly defined.
- Changes in Production Parameters: If there have been recent changes to production parameters or settings, it may lead to this error.
Solution:
Check Material Master Data:
- Go to the material master (transaction code MM03) and check the relevant views (e.g., MRP, Work Scheduling).
- Ensure that the in-house production time is correctly defined and that it is set to be independent of lot size if that is the intended configuration.
Review Production Scheduling Profile:
- Check the production scheduling profile assigned to the material. Ensure that it is configured correctly and that it aligns with the intended production strategy.
Adjust Lot Size Settings:
- If the material is intended to have lot size-independent production time, ensure that the lot size settings in the material master are configured accordingly.
Check Routing and Production Version:
- Verify that the routing and production version for the material are correctly defined and that they match the production process.
Consult SAP Notes:
- Check for any relevant SAP Notes that may address this specific error message or provide additional guidance on configuration.
Testing:
- After making the necessary adjustments, perform a test run to ensure that the error does not reoccur.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with an SAP functional consultant or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
MM171
Lot size dependent in-house production time will be reset
What causes this issue? You have specified a lot size <ZH>independent</> in-house production time. A lot size <ZH>dependent</>...
MM170
No export control determination for legal regulations & is possible
What causes this issue? For legal regulations &V1&, you have specified an <DS:DE.ALNUM>export control class</>, but no <DS:DE....
MM173
Not possible to maintain inflation data here
What causes this issue? You wanted to maintain inflation data. However, this requires: You to specify a plant or company code (depending on whether v...
MM174
Not possible to maintain MRP areas here
What causes this issue? You wanted to maintain MRP area data. However, this is not possible in the following cases: If the MRP areas have not been ac...
Click on this link to search all SAP messages.