Do you have any question about this error?
Message type: E = Error
Message class: MILL_PC - Mill: Message Pool for Confirmations
Message number: 172
Message text: PB not at top level; proposal of actual quantity not possible
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MILL_PC172
- PB not at top level; proposal of actual quantity not possible ?The SAP error message "MILL_PC172 PB not at top level; proposal of actual quantity not possible" typically occurs in the context of production planning and control, particularly when dealing with production orders or process orders in the SAP system. This error indicates that the system is unable to propose an actual quantity for a production order because the production batch (PB) is not at the top level of the bill of materials (BOM) or production structure.
Causes:
- Incorrect BOM Structure: The production batch may not be correctly defined in the BOM, or the BOM may not be structured properly.
- Batch Management Issues: If batch management is enabled, the system may require that the batch be at the top level to propose quantities.
- Order Status: The production order may be in a status that does not allow for quantity proposals.
- Missing Master Data: There may be missing or incorrect master data related to materials, production versions, or routing.
Solutions:
- Check BOM Structure: Verify that the BOM is correctly structured and that the production batch is defined at the top level. You can do this by navigating to the BOM in the SAP system and ensuring that the hierarchy is correct.
- Review Production Order: Check the status of the production order. Ensure that it is in a status that allows for quantity proposals (e.g., not completed or closed).
- Batch Management Settings: If batch management is being used, ensure that the batch is correctly assigned and that it meets the requirements for the production order.
- Master Data Verification: Ensure that all relevant master data (material master, routing, production version) is complete and accurate. You may need to update or correct any discrepancies.
- Consult Documentation: Review SAP documentation or help resources for specific details related to the error message and its context.
Related Information:
CS03
(Display BOM), CO03
(Display Production Order), or MM03
(Display Material) to investigate the issue further.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
MILL_PC171
Cancel confirmations before removing assignment to &1
copied from HM6What causes this issue? You cannot remove the asignment of process batch &V1& to the original order, as you have already save...
MILL_PC170
Process batch &1 already assigned; merge not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MILL_PC173
Process batch &1 has successor in combined order
copied from HM6What causes this issue? Subsequent process batches exist in the combined order for process batch &V1&. As a result, it is no ...
MILL_PC174
Process batch &1 already copied; split not possible
copied from HM6What causes this issue? The system has already copied process batch &V1& to the combined order. Therefore, this process batch...
Click on this link to search all SAP messages.